Technical specifications for Drilling Mud Purification system
Drilling fluid purification solid-control system is an requisite part in modern drilling. It will ensure the slurry of the normal circulation and stability in the process of drilling rigs. the product is mainly made up of explosion-proof driving force, electric distribution and lighting control devices, new dual-layer and dual-excitation shale shaker, centrifugal vacuum degasser , desander, desilter , horizontal centrifuge, vertical sand pump, slurry mixers, mixed feeder funnel, cycle tanks, and other solid control equipments and so on. It can effectively separate and mix round and store drilling fluid, to meet the needs of drilling project. And we absorb and develop a complete set of solid control system, as ZJ40J, ZJ50D, ZJ70D, ZJ32, ZJ20B7 models.
Main equipments
No. | Name | Specification | Qty | Remark |
1 | Tank NO.1 (shaker tank)
| Overall dimension: 13700mm×3100mm×2700mm sand trap: 76 BBL Degasser compartment: 100 BBL Desander compartment: 128 BBL Disilter compartment: 128 BBL
| 1 | Including accessory pipeline
|
2 | Tank NO.2 (suction tank)
| Overall dimension: 13700mm×3100mm×2700mm Suction compartment: 396BBL Pill compartment: 72bbl | 1 | Including accessory pipeline
|
3 | Tank NO.3 (reserve tank)
| Overall dimension: 11700mm×3100mm×2700mm Reserve compartment: 250 BBL×2 | 2 sets | Including accessory pipeline |
4 | Trip tank
| Overall dimension: 11700mm×3100mm×2700mm Trip compartment:61BBL | 1 set | Including accessory pipeline |
5 | Shale shaker
|
| 2 pecs | Model HS280-3P |
6 | Degasser vacuum | Horizontal type | 1 pec | Model HV-240 |
7 | Disander
|
| 1 pec | Model HD-300x2 |
8 | Desilter |
| 1 pec | Model HM-100x12 |
9 | Sand pumps and weight pump
| Mode:SB6×8-55kW Outlet diameter:6″ Inlet diameter: 8″ Displacement:200m3/h Motor power:55 kW | 5 pec |
|
10 | Trip pump
| Mode: SB3″×4"-11kW Displacement:47m3/h Head:20m Motor power:11kW | 1 pec |
|
11 | Poor boy degasser
| Working pressure:0.7MPa ID:1200mm Max treat capacity:424 m3/h Will be installed on the same skid as the trip tank. | 1 | As per API Standard |
12 | Agitator
| Mode:NJ11 Power for each motor:11 kW | 6 pcs |
|
13 | Surface and bottom Mud guns | DN80/PN1.0 | 20 pecs |
|
14 | Mud mixing hoppers | Mode: ZHP150 Treat capacity:180m3/h | 2 sets |
|
15 | Sack hoist fame | Including 2T hoist | 1 |
|
16 | Mud test room | 2500x1600x2500 mm | 1 |
|
17 | Eye washing station |
| 1 |
|
18 | Trailer | trailers should be located permanently under the tanks. Number of axles to be calculated. Pin size should be 3 ½” & 2 ½” | 4 |
|