steel H beam portal frame steel structure workshop/factory/warehouse
USD $30 - $100 /Square Meter
Min.Order:300 Square Meters
Shandong Classic Heavy Industry Group Co., Ltd.
Goods Name | Cost-effective Steel Structur warehouse | |
Dimensions | SIZE | MOQ is 300m2, width X length X eave height, roof slope |
EAVE Height | 3 Meter - 30 Meter ( According to customers ) | |
MOQ | 300 m2 | |
Type | Single slope, double slope, muti slope; Single span, double-span, Multi-span, single floor, double floors | |
Specifications | Base | Cement and steel foundation bolts |
Material | Q235B, Q345B or others as buyers' requests. | |
Purlin | C PURLIN or Z PURLIN : Size from C120~C300, Z120~Z300 | |
Bracing | X-type or other type bracing made from angle, round pipe, etc | |
Surface | Two lays of Anti-rust Painting or Hot Dip Galvanized | |
Bolt | Plain bolt and High-strenth bolt | |
Roof &wall | Single color corrugated steel sheet0.326~0.8mm thick,or sandwich panel with EPS, ROCK WOOL, PU etc insulation thickness around 50mm~100mm, or as buyers' requests | |
Door | Sandwich panel sliding door , rolling door or as buyers' requests | |
Window | Aluminium alloy window, PVC window | |
Accessories | Roof ventilators, Gutter, Rainspout , Saddles buckle , Waterproof plug , Sealant etc. | |
Advantages | 1. Lower cost but beautiful outlook. | |
2. High safety performance. | ||
3. Easy to assemble and dismantle | ||
4. Manufacture under complete quality control system---ISO9001 | ||
5. Installation with instruction of experienced engineers | ||
6. Non-pollution. | ||
Usages | 1. workshop, warehouse, plant , garage | |
2. Steel structure frame | ||
3. Multi-story building or high rise building project | ||
4. Portal frame products | ||
5. Structure for smelting and chemical equipment | ||
6. Others steel structure buildings |
steel warehouse main component
column and beam | material q345 H section steel ( painted or galvanized) |
wall&roof purlin | c or z section steel, size from c120~C320, z100~Z200 |
wall&roof panel | colorful corrugated steel sheet ,sandwich panels with eps, rockwool, fiber glass, pu etc. |
supporting | steel angle, steel pipe, steel round. |
gutter | steel sheet or galvanized steel sheet |
rainspout | pvc pipe |
door | sliding sandwich panel door or rolling metal door |
window | pvc or aluminum alloy windows |
accessory | anchor bolt,high strengthen bolt, normal Bolt, skylight Belts, ventilators, etc. |
Q1:Why should I build using steel structure?
Answer:
*Steel has the higher strength.
* 80% recyclable, Steel is the most recycled material in the world.
* No warping, no cracking, no chemical treatments.
* Stronger connection.
* Lower transport costs due to lightweight frames.
* Steel frames will not burn, fire proof.
* Lightning will not affect a steel framed house since steel creates a positive earth. Lightning energy is conducted straight to the ground.
* Each steel structure is a independent engineered.
Q2:Can we construct steel framed house on sea shores or mountains?
Answer:Steel systems are highly resistant to rust by galvanization process and can be lived safely mountainous areas or seaside areas with intense salt.
Q3:Do steel constructions harm the nature?
Answer:Steel is 80% recycling material. So it does less harm to the nature compared with the other type buildings.
Q4:Are steel structure buildings expensive?
Answer:The steel structure of SBS company is economic. Its technology and materials used decreases waste expenses such as wood, decorative stone, brick etc. All the material including the steel frames, wall body and roof for installation are prefabricated during the production process, therefore the labor costs for installation is decreased.
Q5: Are you manufacture factory or trading company?
Answer: CLASSIC GROUP are a factory with export license . We has the right to import and export business in China , is a comprehensive and large-scale industry and trade enterprises. You are welcomed to visit us for inspection at any time .Our workshop and the quality control flow will show you our professional.
Payment : L/C or by T/T(30% prepaid as depsit, the balance 70% before shipment)
Delivery time : 15~40 days,usually as customers's order
Shipment : 20'GP, 40'GP,40'HQ, 40'OT or in bulk
Project detail:
Customers Visting
Installation tools
Shandong Classic Heavy Industry Group Co., Ltd.
steel structure warehouse