low cost prefabricated house/Prefabricated light gauge steel framing house
USD $50 - $200 /Square Meter
Min.Order:100 Square Meters
Shandong Classic Heavy Industry Group Co., Ltd.
light steel structure green house/green prefab house/green prefabricated house
Prefabricated Sandwich Panel House for accommodation, temporary living, office/private
Prefabricated Houses/granny flat/cottage with solar system and light steel structure
Low cost prefabricated house with modern design customized steel frame prefab house
Light Frame Building Construction Prefabricated Steel Frame House
Project name | Prefabricated Steel Frame House |
Structure type | Light Steel |
Design standard | AISI ASTM BS DIN GB JIS NSCP |
Dimensions | Customized |
Cladding material | Galvanized purlin, Color steel sheet, Fittings, etc |
Features | 1. Stable and Aesthetic |
2. Structure is durable for 50 years | |
3. Fast and easy to install | |
4. Extensive Applications: Storage, Warehouse, Exhibition Hall, Terminal Building, Stadium, Theater, Special-shaped Buildings, etc | |
5. High anti-rust performance | |
6. Flexible composition: Doors and Day-lighting roof could be installed at any position |
Light Frame Building Construction Prefabricated Steel Frame House
Characteristics:
1. Environmentally friendly, no waste produced during assemble.
2. Flexibility when fixing doors, windows and interior partitions
2. Live load capacity of roofing0.5kN/m2
3. Second floor load capacity: 150kg/m2
Main steel frame : | Steel Welded H Section or hot rolled H section (specification Q235, Q345 ) for columns and beams |
Roof panel : | EPS sandwich panel , glass fiber sandwich panel , rock wool sandwich panel , and Pu sandwich panel |
Wall panel: | Sandwich panel |
Door: | Sliding Sandwich Panel Door or rolling Metal Door |
Window: | PVC/Aluminum Alloy Window |
Connecting: | Post feet bolts, intensive bolt , intensive bolt |
Customer Visting
Light Frame Building Construction Prefabricated Steel Frame House
1.How to buy your idea products?
TT and L/C are acceptable and TT will be more appreciated. 30%deposit before producing, 70% balancebefore loading by TT.
2.What is the delivery time?
It depends on order quantities.Generally speaking,the delivery time will be within 15 to 40days.
3.How to pack the products?
A:Weusestandard package.If you have special package requirements,we will pack as required,but the fees will be paid bycustomers.
4.How to install after the goods arriving destination?
A:We will provide detailed illustrations to you.If it is necessary,we will send technicians to help you.However,the visa fee,air tickets,accommodation,wages will be paid by buyers.
Light Frame Building Construction Prefabricated Steel Frame House
Light Frame Building Construction Prefabricated Steel Frame House