Nonstandard Drive Shaft
USD $30 - $500 /Piece
Min.Order:1 Piece
Konic Gearbox (Dalian) Co., Ltd.
Konic Gearbox (Dalian) Co., Ltd. is a manufacturer processing the components for the Gearbox and the whole gearbox as the reducer or the speed-up gearboxes.
Specialized in produced the customized gearbox and the components as the drawings.
For the processing, have a team with some experienced people to do the processing the key parts, do the quality control, and the technical support.
For the international business support, we have a team can give you a good service with more than 7 years export experience.
Forging Parts: | Hot forging high precision machined bench steel shaft |
Materials: | Alloy Steel like, 42CrMo, 18CrNiMo7-6, 17CrNiMo6, 40CrNiMo, 42CrMo4, 40Cr, 35CrMo, 20CrMnMo, 45#, 38CrMoAlA, 34CrNiMo6, 35#; Carbon Steel; Stainless Steel or other materials required by the customer. |
Dimension: | Dia:5mm ~ 600 mm; Length: 50 mm ~ 3000 mm |
Weight: | 0.5 kg ~ 2000 kg |
Application: | Transmission parts in the gearbox or other place. |
Inspection: | Chemical composition; UT; MT; Mechanical property; Dimension inspection; CMM test; other inspection request by the customer. |
Standard: | GB; ASTM; ASME; DIN; JIS; ISO; BS; API; EN |
Heat treatment: | Normalized; Annealed; Quenched; Tempered; Others. |
Q.C. Doc.: | Chemical composition report; Mechanical properties report; UT test report; Heat treatment report; Dimensions check report; CMM testing report; or other reports as the customer’s request. |
Our requirements:
1. All packing prepares product for shipment in a manner deemed to be safe, preventing damage or corrosion to product, and satisfying customer requirements.
2. Unpainted surface are to be coated or packaged to prevent corrosion or damage.
3. At a minimum, product will be skidded, blocked, and banded down or constrained in a manner to prevent shifting and undesirable movement in transit.
4. When blocking product it is required that all blocks/ supports be placed under stationary features and will not shift during transit. Straps/Chains from the truck should then be placed over those supports when applicable.
5. Konic Gearbox representative must verify that the load, chains/straps and tarp are assembled in such a way to avoid damage to the product during transit.
1. Emergency 24hours/7days Service
2. Free service Quotations
3. Customized unit production
4. All job Dimensions
5. Over 30 years Experience
6. Each step information update
7. Updated shipping information
1. Are you a factory or trade company?
We are a factory located in Yingchengzi Town of Dalian City, the north of China.
2. How about your quality.
Konic Gearbox will supply the high quality products as your requirement.
Our engineer has in this area for more than 30 years.
3. What is your payment term?
For the customized products, 50% pay in advance, 50% against copy of B/L.
4. How long you can send your quotation to us.
After got all the detail information, we will quote within 2 work days.
5. What is your quotation element?
Drawing, material, weight, quantity and technical request.
6. Emergency contact information
Ms. Gareth Guan
Mob: +86-138-8946-8242
Skype: gareth.guan
7.
Order Folw Chart with Service | |||
Flow Chart | Customer's Active | Our Service | Days |
Bofore order, confirm the details and informations | Send all the information about the products, like the drawings, materials, weight, quantity, technical require, requirements (Products; delivery; price; payment terms) and others. | 1. Transform the drawings let the drawings suitable for the processing. 2. Send the information which the customer needed. 3. Confirm all the details and technical information with our technical person. 4. Send the quotation with all the details, like the delivery, package, payment terms, and other informations. | 1-2 weeks |
Order confirmation | Send the order to us. | Send the signed order and with a PI | 2 |
Deposit payment | Do the deposit payment as the PI. | Send the email once got the deposit. | 3 |
Start of the production | 1. Waiting for the feedback of the prodcts situation. 2. Give a feedback for the technical or others questions about the products. 3. Arrange the inspetion in person or by the third party. | 1. Send the photos of the products. 2. Give a ETD. 3. Send all the doubt to the customers and got the conformation to the production lines. 4. Send all the reports and waiting for the inspection from customer or the third party inspection. 5. Send the package photos to customer. | Depends on the types, quality and others informaiton of the products. |
Delivery after passed quality of the products. | 1. Send the balance of the order to us. 2.Waiting for all the documents and other informations of this orders. | 1. Send the copy of the B/L got from the shipping lines, the invoice, packing list and other documents, and then inform our customer do the payment of the balance. 2. Send the email once got the balance of the orders. 3. Send the full set original shipping documents, the inspection documents to the customers. 4. The ETA and track the shipping lines with the delivery details. | Depends on the final destination and the way of transportation |
After-sale service | Send the requirement to us. | 1. We will give a feedback within 1 work day. 2. Give you a experienced technical support. 3. Supplied the maintaince and repair service. 4. Give you a Emergency Contact Information that you can fine us anytime. | Any time |