u/c channel steel price
USD $0.3 - $1.2 /Meter
Min.Order:1000 Meters
Shaoxing Bossen Building Systems Co., Ltd.
A. Made of excellent cold-formed galvanized rolled plate and with uniform material, high strength and good rigidity, steel joist enjoys perfect construction performance. With good rust-resistant and corrosion resistant performance, it is galvanized on both sides and prior to Chinese standard for high-class product. |
B. Adopting multi-roll production technology, ensuring steel strap’s gradual deformation, full release of main stress and uniform distribution of remaining stress can effectively prevent the ceiling gypboard joint from crazing. |
C. Automatic production line for steel furring’s cutting at random and ECV servo technology will ensure the dimension accuracy. |
D. It is very easy to drive in and saves time while installing |
E. We not only have great variety of steel furring, including all the kinds in the market, but also produce the ones based on customers’ requirements. |
Payment: we usually accept T/T,L/C, D/P, D/A, OA, please send email to negotiate payment term if you can not accept T/T or L/C
Delivery Time:
Design stage: 3 to 10 days after receive
LGS Frame manufacturing lead time: 15-30 days 40% deposit
Pre-assembly time: 3~7days
For urgent order, Could be faster, please send email to negotiate
How to make an order?
1. Make house design (or to choose from the design collections)
2. Manufacture the LGS steel frame, purchase other materials from cooperative-companies
3. Make pre-assembly ( if required)
4. Inspection
5.Arrange shipment
c channel steel price| c channel steel price| c channel steel price