High quality auto Ignition coil as OEM standard 22448-31U05, 22448-31U06,22448-31U15, 22448-31U16,22448-31416
USD $1 - $60 /Piece
Min.Order:100 Pieces
Shanghai Changhui Imp.-Exp. Co., Ltd.
High quality auto Ignition coil as OEM standard 22448-2Y000, 22448-2Y001
High quality auto Ignition coil as OEM standard 22448-4W000, 22448-4W001
High quality auto Ignition coil as OEM standard 22448-24015, 22448-2Y005,22448-2Y006, 22448-2Y007
High quality auto Ignition coil as OEM standard MD362907, MD325048 ,89057964, 88921386
High quality auto Ignition coil as OEM standard ZZY1-18-100 ,BP6D-18-100A, BP6D-18-100A-9U
OEM 22448-31U05, 22448-31U06 |
22448-31U15, 22448-31U16 |
22448-31416 |
BBT IC16104 |
BERU 0040102071 |
BOSCH 0 986 JG1 216 |
BREMI 20192 |
ERA 880159 |
LUCAS DMB1011 |
STANDARD UF232 |
WELLS C1001 |
1.Main Materials |
1)Enamelled Copper wire ( JAPAN Fuji Fine ) |
2)Housing Material ( GERMAN BASF ) |
3)Plastic components ( SABIC–Former GE ) |
4)Resin ( JAPAN Kyocera ) |
2.Main Production Equipments: |
1)Casting equipment ( From Germany Hedrich ) |
2)Winding machine ( From Japan Nittoku ) |
3)Drying tunnel |
4)Laser mark machine |
5)Punching machine |
6)Injection molding machine |
3.Production Process |
1) 100% check Raw materials /components |
2) Assembly Components |
3) Semi-finished Parts inspection |
4) Resin Injection (Vacuum Casting) |
5) Gelling and curing |
6) Finished products |
7) 100% Performance Test |
8) Packing ( Do Random Test ) |
4.Main Testing machines |
1)Performance Tester ( to test the technical parameters) |
2) High-low temperature tester ( Thermal shock tester ) |
3)Endurance tester ( continuous spark test / life test under normal temperature + high temperature ) |
4)Housing Insulation Tester |
5)LRC tester |
6)Number of turns tester,Polarity Tester, Resistance and Inductance Tester . |
7)High voltage tester |
8)Visual inspection instrument |
9)Vibration Tester |
10)Salt-Spray Tester |
11)voltage-withstand tester |
12)Energy Tester |
5.Export Ratio: 81% - 90% |
1)Warranty:1 year,5‰ defective percentage | |||||||||
2)Delivery Time: Within 30~40 days after receipt of 30% deposit | |||||||||
3)Delivery Quality:According to the sample which is approved by the buyer. | |||||||||
4)Payment Terms: 30% deposit and the rest 70% to be paid before delivery byT/T |