Artificial turf grass golf course lawn
USD $2 - $12 /Square Meter
Min.Order:500 Square Meters
Guangzhou Citygreen Athletic Facility Co., Ltd.
Artificial turf grass golf course lawn
Color | Dark green |
Grass Height | 10mm, 12mm, 15mm, 20mm, 25mm |
Grass Yarn | PA(Curly) |
Dtex | 4400 |
Gauge | 3/16 available |
Stitch Rate | 130 to 350 stitches/m or customized |
Color | Green |
Backing | Double layer PP+ SBR Latex |
Roll width | 2m or 4m available |
Roll length | 25m or customized |
Packing | In roll with film covered |
Characteristics:
1. Excellent rebound and softness performance, ensure the safety of kneels and skin;
2. Achieve sports standard of natural lawn, comparable with natural turf fields;
3. Good drainage, anticorrosive anti-moldy, fastness and UV resistance;
4. Excellent anti-wear performance can increase use frequency of fields;
5. Easy installation and maintenance;
6. All weather usability;
7.16 different types of artificial grass for selection.
Prepared before Installation:
How to Installation
1.1. Inspection:
Inspect the foundation to ensure it has a flat and smooth surface and appropriate slopes,making sure the
foundation is qualified for installing artificial turf;
1.2. Measuring:
Locate the centers of the ground and the two semicircles, and according to these three centers locate the
intersecting point of half-way lines and touchlines, and then determine the positions of functional lines
and spot by using Pythagorean proposition;
2. Turf layout:
According to drawing, position the turf rolls on the exact places along the touchline.The turf with white
lines should be placed at the half-way lines and base line, and then lay out the rolls in order;
3. Preparing functional line:
Cut white turf piece into strips(width to be as per actual need) for white functional lines(half-way lines,
base lines etc.), and put them aside preparing for Green Artificial Grass Carpet installation;
4. Seaming:
The adiacent turf rolls must be join together with 20~30mm excess on both sides, then cut the excess
part with a special cutting knife on the joint center and trim the cut to make the turf join perfectly
together. After trimming, place the seam tape on the foundation surface and make the joint line of turf
right on the middle of the seam tape. And then apply the adhesive to seam tape evenly with a rubber
spreader, and press down the turf on both sides of the seam tape firmly;
5.1. Installing functional lines:
Measure and re-position the functional line on the turf that has been all well joined on the ground. Cut
theturf out and place the seam tape beneath the cuts, then spread the adhesive on the seam tape and
install the well-prepared functional lines, press it firmly to ensure the immobility.
5.2. Trimming:
Inspect the finished lawn, if any uneven found, cut it open, pull it straight and cut the excess away.
And rejoin it with adhesive;
6. Infilling sand:
Place the sand piles on the finished lawn on different spots evenly at a distance of 4m from each other,
then spread them evenly on the lawn(the quantity if sand depends on the pile height of the turf).
Afterwards, use the combing machine to sweep the sand into the fibers and to comb uo the fibers. Do
this process once longitudinally and transversely.
7. Infill rubber granules:
After sand infilling, Place the rubber granules piles on the lawn on different spots evenly at a distance
of 4m from each other, then spread them evenly on the lawn(the quantity of sand depends on the pile
height of the turf). Afterwards, use the combing machine to sweep the sand into the fibers and to comb
up the fibers. Do this process once longitudinally and transversely.
8. Combing:
Once the infilling is finished, comb the turf once more with the combing machie to make the fibers
point up to the sky.
9. Inspection:
Inspect the entire finished lawn as per concerned standards and requirement.If any defects found,
correct it.
1. Raw materials:
Only brand-new and qualified Fake Grass Carpet For Soccer Fields materials are allowed to be used for
our production, no recycle or wastage material allowed. Only qualified products are allowed to release
out of our factory. Proper guarantee from 5 to 10 is given to every product.
2. Production facilities:
Our factory possesses an area of 40,000 m2 and is equipped with advanced high-tech facilities
including American TUFTCO tufting machine, British COBBLE tufting machine, Australian CTS
two-way coating machine with 20 meters length. We provide good and stable quality Fake Grass
Carpet For Soccer Fields and punctual delivery. You are welcome to visit Citygreen factory!
3. Certificates:
We get Labosport certificate; SGS certificate (chemical data test-nonhazardous proof); UV resistant test
(1200 Hour); CE certificate ; CTA certificate of quality inspection(issue by China testing alliance);
ISO9001 quality system qualification, ISO14001 Environmental certification, and etc for our Fake
Grass Carpet For Soccer Fields.
4.Good service:
We respect any requirements from customers, no matter daily inquiry, request or complaints; we
respond quickly and do not escape from responsibility for our Fake Grass Carpet For Soccer Fields.
5.Our pursuit
We are honest, responsible and reliable to every customer and the whole society; we will not release
any unqualified product to the market.At the same time, we still have shortages to overcome; we
hope that you can give us support and suggestion.
6. Our development:
We become the Chinese agent of two world famous artificial yarn material suppliers:
The Netherland Royal Tencate Group and Saudi Arabia Mattex group(Green Vision company).
Ensuring our customers will have the best quality and highest performance Fake Grass Carpet For
Soccer Fields products available in the market.
1. What’s the MOQ of your Fake Grass Carpet For Soccer Fields?
500 sqm/model.
2. What’s your production time?
About 5 to 15 days.
3.Do you have export license?
Yes, we can finish export clearance process by our own.