plastic drinking bottle cap mould
Negotiable /Set
Min.Order:1 Set
Taizhou Huangyan R&D Plastic Mould Co., Ltd.
As a professional plastic mould manufacturer in China, we are specialized in opening new molds for various of plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.
Following information is essential for your better understanding on our moulds
name | Plastic Bottle Cap Mould |
mould material | 718 2738 P20 S136 etc |
cavity | single/mulit |
runner | hot / cold |
mould design | 3D/2D |
design days | 3-5 days |
mould life | 300.000-3.000.000 |
plastic material | PE PC PS PP ABS PVC ect |
injection system | pin-point gate |
payment | 40% of deposit by L/C T/T 60% of balance by L/C T/T |
delivery time | 30-50 days |
specification | depends on customers' demand |
CAP MOULD FEATURES:
1. Adopt special cap mould treatment technology, key parts using corrosion resisting mirror steel, surface hardness can reach HRC60°
2. Mould material adopts imported P20, 2316 etc mould steel.
3. Hot runner is designed advanced and reasonably, each cavity heat controlled independently, which makes the temperature uniform.
4. Germany HOTSET or Italy ROTFIL hot runner.
5. Each cavity and core has independent cooling system, which can shorten production period.
6. Mould can be self knockout, reduce labor cost.
7. The mould cavity can be changed, which is convenient to change remark of the cap.
8. Mould lifetime can be guaranteed with 2 million mould times.
Business Step | |||||||
1. R& D | We support customer R& D. Make the files or improve the design if you needed | ||||||
↓ ↓ ↓ | |||||||
2. Quotation Making | Mould Quotation will be finished in 1 day according to information we get | ||||||
↓ ↓ ↓ | |||||||
3. Negotiation | The quality, price, material, delivery time. payment item. ect | ||||||
↓ ↓ ↓ | |||||||
4. Mould Design | 3-5 days for mould and product 3D/2D drawing design | ||||||
↓ ↓ ↓ | |||||||
5. Mould | According to customers' request to build the mould. Before make the mould. we send mould design to customer approval first. Mould will be usually finished in 25-60 days | ||||||
↓ ↓ ↓ | |||||||
6. Mould Testing | When moulds are finished, we will test the moulds to check it satified consumers' needs. And we will send samples for consumers' reference. | ||||||
↓ ↓ ↓ | |||||||
7. Sample shoot | If the first sample come out is not satisfied customer. we modify the mould and until meet customers satisfactory | ||||||
↓ ↓ ↓ | |||||||
8. Delivery | Delivery goods by sea or by air, according customers requirement |