clay old brick for Decorative brick
USD $0.4 - $0.6 /Piece
Min.Order:550 Pieces
Dalian Puwan New District Dongsheng Building Material Factory
1.All the old brick comes from 1905-1945, and it is the old brick that 80-90 years ago.
2.Each brick surface is natural weathering, natural fade, a hundred years mark
3.Simplicity, nature and innate.
4.It is different from doing old brick, antique brick.
5.It is the true sense of retro brick.
All the dongsheng old brick comes from 1900-1945, made by the pure hand in the northeast, oak wood fire baked by clay brick, making the product of pure loess, do not add preservatives or chemicals and ashes, etc.. The old brick is from Japanese buildings recently, Each brick is manually demolished and removed,then machine cuts.
The old brick is in clay, shale, coal gangue as raw material, by grinding and mixing, kneading and using manual or mechanical molding, after drying under 900 centigrade degrees of temperature in oxidizing flame burning and the burning building bricks.
Because of the old brick production in the long history, each brick is after natural weathering, naturally fade, tile mark is 100 years of accumulation, brick surface appearance is different from other antique brick, brick modern, so there is no exactly the same size and color, is the true meaning of ancient brick. That is shows the simple, elegant, calm is innate, and other antique brick can not imitate and match.
So Dalian old brick surface is not completely consistent, brick surface weathering, round edge and concave, lack of meat phenomenon, belongs to the essence of Dalian old brick generic.
By this period the old brick in terms of purity, viscosity and quality are the most suitable for decoration.
Dalian Dongsheng old brick can be widely used in high-grade building indoor and outdoor decoration, cafes, Bar, background wall, top grade restaurant, villa, courtyard, club, barbecue shop, etc..
1. Manufacturer not trader.
2. We will reply you for your inquiry in 24 hours.
3. When you got the goods, test them, and give me a feedback.If you have any questions about the problem, contact with us, we will offer the solve way for you.
Q1. How about your delivery time?
A: Generally, it will take 7 to 10 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q2. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.
Q3: How do you make our business long-term and good relationship?
A1: We keep good quality and competitive price to ensure our customers benefit ;
A2: We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.
Q4:Can we visit your factory?
A:Sure,welcome at any time,seeing is believing