two floors new design light steel large villa house
USD $100 - $100 /Square Meter
Min.Order:20 Square Meters
Beijing Tianlicheng Integrated Housing Co., Ltd.
GREAT LIFE----Safe/ Durable/Comfortable
1,Anti-seismic
LGS steel construction uses triangle truss structure of cold-formed steel, its main wall use cold-formed steel as frame, bolting makes the house body tightly connected to the ground, with good ductility and anti-seismic performance. LGS steel construction’s seismic fortification is up to 9 degree, and steel structure house cause less damage in the earthquakes than other houses.
2,Wind Resistance
Cold-formed light weight steel structure buildings adopt G550 high strength steel with good steel integrity and flexibility, which can resist 50m/s wind speed. Life and property will be well protected.
3,Durable
Light steel structure house is all composed with cold-formed light steel structure parts which adopt galvanized/aluminum -zinc and anti-corrosion cold rolling steel plate. This can effectively avoid being rusted during the constructing and using of steel structure parts and increase the lifespan to more than 90 years.
4,Sound insulation
The effect of sound insulation is an important indicator for the assessment of residential. Light steel system walls formed by light steel structure, insulation materials and fiber board have perfect sound insulation and shock absorption technology and meet the national standards for building sound insulation.
5,Comfortable
Using energy efficient LGS steel wall system, respiratory function, it can adjust indoor air humidity. The roof with ventilation function, which can make the house internally over the formation of the flow of air, ensure that the roof ventilation and cooling of the internal demand. The light steel integrated housing span can up to 6 to 12 m to provide larger living space for residents, and can also be freely divided. The integrated light steel building materials are green environmental friendly, and keep healthy.
6, Easy-quickly Construction
All materials can be completely produced in factory and installed at the construction site. It can not only reduce the intensity of on-site construction, but also improve the efficiency of construction and engineering quality. The residential environment can be built before the house and then house can be completely designed and manufactured in accordance with the demand of the buyers residential. The interior decoration can be finished one time through the overall design. Construction is high speed, short time, high efficiency, less impact from the seasonal all-weather construction. It takes 8 workers to finish 300 square meters villa. The construction time is only 2 months.
We could provides the optimized solution to meet customer's request with our advanced design software which with Canada technology. We could do as per your design, also we have various design with different models for your further option.
A. Wall and roof frame:
1) GI cold frame forming steel designed with advance software. And make the production automatically .
B. Roofing & Ceiling:
1) metal roof panel, 75mm+100mm insulation for roof
2) Include flashing, screws, sealant
3) 1 layers 12mm plaster board
C. Wall panel:
1) Culture stone external wall finish,50mm XPS,100mm insulation,12mm plasterboard for external wall panel
1) 12mm OSB for wall base board
2) 12mm plasterboard @ each side
3) Waterproof plasterboard for wet area
4) Include flashing and screws
D. Flooring:
1) Galvanized G450 200 C section at 600mm thickness for floor beam
2) 18mm OSB and 75mm insulation for floor
3) 1 layers 12mm fire rated plasterboard for floor ceiling
4) Include connection bolts and fasteners