middle capacity beverage bottling equipment
USD $57,000 - $68,000 /Set
Min.Order:1 Set
Zhangjiagang Chunyuan Machinery Co., Ltd.
beverage bottling equipment
Product Description
The bottled water manufacturing equipment integrates washing,filling and capping into one machine.The water equipment is used in production of mineral water and pure water packed in PET bottles. The filling is quick,steady and accurate.
Product Advantages
1.the gravity fixed liquid surface filling is used
2.the filling is past,the amount of liquid is accurately controlled and the dropping and leakage are avoided
3.there are two times of internal and external washing,the efficiency of bottle washing is high
4.the filling and capping will be stopped automatically when there is no bottle
5.when bottles are crampled wrongly or when caps are not available, thebottled water manufacturing equipment machine can be stopped automatically
6.the frequency changing technology is used to adjust the operation speed steplessly
7.the production capacity can be displayed digitally and can be adjusted conveniently
Technical Parameter
Model | XGF12-12-6 | XGF18-18-6 | XGF24-24-8 | XGF32-32-8 | XGF40-40-10 | XGF50-50-12 |
Peoduction Capacity(500ml)b/h | 4000 | 6000 | 10000 | 14000 | 18000 | 24000 |
Total Power(kw) | 3.58 | 4.68 | 6.58 | 9.68 | 9.68 | 10.8 |
Suitable Bottle | PET bottle,round or square |
Photos
filling
capping
Company View
Quality Assurance
1. Our company ensures that all provided goods are new, which never been used, and use the newest design and suitable materials, and at each aspect, they are line with quality, specification and function in contract.
2. Our company guarantees the mechanic function of equipment, quality and consumption index of products.
3. The guarantee period of our products is 12 months after acceptance from buyer. Within this period, we would provide free spare parts and timely as well as effective service to clients.
4. If equipments have faults that need to repair at scene, we promise that our technicians would go to clients’ factory in shortest time, and help customer debug the production line (except the force majeure)
5. After guarantee period, we would provide effective technical support, enough spare parts and excellent after-sales service to customers for life.
Installing, Debugging
1. After equipments transported into user’s workshop, user shall arrange the position of equipments according to layout.
2. Our company will send professional technicians to supervise the installing, debugging, and testing of equipments and our engineers would adjust equipments to designed index in planed time.
3. During the debugging, our company will supply some free spare parts, and fittings.
Workers’ training
1. Our company will be responsible for technical training to buyer. The training content includes structure and maintenance of equipment and equipment control and operation, ect;
2. Training can be in the buyer’s factory. Our company will send qualified technicians to teach and make corresponding training outline.
3. After training, buyer should master related operation and maintenance of equipments, and should be able to solve some common problems masterly.