Chines new type post tensioning steel wedge head for construction
Chines new type post tensioning steel wedge head for construction
Chines new type post tensioning steel wedge head for construction
Chines new type post tensioning steel wedge head for construction

Chines new type post tensioning steel wedge head for construction

Negotiable /Set

Min.Order:200 Sets

Supply Ability:
1000 Set / Sets per Month
Port:
Shenzhen Guangzhou Qinzhou
Payment Terms:
T/T L/C D/P D/A Credit Card PayPal

Quick Details View All >

Place of Origin:
Guangxi, China
Brand Name:
LQM
Model Number:
P8
Material:
Steel

Liuzhou Nanbu Jiazheng Prestressing Machinery Co., Ltd.

Business Type: Manufacturer,Trading Company
Liuzhou Guangxi China
Main Products: Prestressed Anchorage

Product Details

 

Chines new type post tensioning steel wedge head for construction

 

The main technical parameter of our wedge head and wedge

 

 

Matched with strand diameter of12.7mm ; 12.9mm,15.24mm ;15.7mm, 17.8mm-18.5mm, 21.6mm-22mm
Tensile strength1860 Mpa
Yield strength1675MPa
Hardness20-35HRC
Static load test passed anchoring efficiencyηA≥0.95 and elongation ≥2%
With-draw of wedge after stressingλ≤6mm

 

 

 

 

LQM  stressing-end anchorage assembly

 

  

 

 

Chines new type post tensioning steel wedge head for construction 

 

 

Main performance of our wedge head and and anchorage

 

1.All  wedge head, wedge and couplers develop at least 95 percent of the minimum specified ultimate strength of the pre-stressing steel, when tested in an un-bonded state, without exeeding anticipated set.

2. Wege head and wedge  tested in accordance with AAREMA, AASHTO, AASHTO LRFD Design and Construction Specification or BS4447

3. Wedge head and plates shall be hot dip galvanized.

 

General Tensioning Requirements

 

1. Pre-stressing steel shall be tensioned by hydraulic jacks so as to produce the forces shown on the detailed design drawings with appropriate allowances for all losses.

2. For post tensioned work the losses shall also include the anchor set loss appropriate for the anchorage system employed.

3.Maximum applied load on the strands shall not exceed 80% from the ultimate breaking force..

4.The calibration of all the jacking and pressure gauges equipments shall be within 6 months, prior to stressing work commencement.

 

 

Chines new type post tensioning steel wedge head for construction

 

 

 

Chines new type post tensioning steel wedge head for construction

 

 

 

 

 

 

 

 

.

Contact Supplier

Ms. Lynn Deng sales manager Chat Now
Telephone
86-772-3269507
Mobile
13557124658
Fax
86-772-3269242
Address
No. 5, Xinxing Road, Xinxing Industrial Park, Liujiang County Liuzhou,Guangxi

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Construction & Real Estate > Metal Building Materials
Categories
Hi~