300w shoe box led street light,led roadway lamp,led shoebox light
USD $600 - $700 /Piece
Min.Order:5 Pieces
150w 200w 300w shoebox retrofit led street light,led street light head
DLC ETL approval 5 years warranty 1000W HID shoebox lamp replacement 300w LED sheobox ies file ,
DLC 300W 380W Parking lot led shoebox , 1000W shoebox replacement, led shoe box light
Parking lot led shoebox , led parking lot fixture,UL DLC led area light,5000k 100-277v shoebox
HLS-L380M led shoebox light:
1. Products Detail Information
Product Size: | 587/418x418x104mm |
Input power: | 300W |
Color Temp.: | 4300~5700K |
CRI: | ≥75 |
Luminaire Efficiency: | 93~110lm/W |
Input Voltage: | 120~277V, 50/60HZ |
IP Rate: | IP65 |
Power Efficiency: | 0.9 |
Power Factor: | 0.98 |
LED Chips: | CREE |
THD: | <15% |
Life span: | >50000 H |
Main Material: | Die casting housing, Tempered glass lens |
N./G.W.: | 8.2KG/9.2KG |
Master Carton: | 46.8x32.4x29.9cm/1pc |
2. Packing & Payment
Samples: | 1, HLS-L380M led shoebox light sample lead time: 10 to 30 days. 2, The freight should be paid by buyers |
Packing Details: | One set per master carton for led shoe box |
Lead time: | 35~40 days after deposit received |
Delivery Port : | FOB Xiamen |
Terms of payment | T/T ( 30% Deposit, Balance be paid before shipping.) ,Or Irrevocable L/C at sight.) |
3. Unique Advantage
1. Strong R&D ability(5 inovation patents and 30 utility model and design patents)
2. Strict QA&QC(ISO9001:2008;ISO14000)
3. HLS-L380M led shoebox light certificate(UL, CUL, ETL, CETL,FCC, CE,ROHS,DLC,ETC.)
4. Stable production capability
5. One-stop solution for lighting engineering
6. Professional after sale service (5-years-Warranty for LED lights)
4. Cooperation Partner and Engineering Projects
Partner: Philips , Killark , Grainger , Grandlite , ETC
Engineering Projects of HLS-L380M led shoebox light :
1 LED Project at Fuzhou Airport 2 LED Solar Project at Tong'an
3 Project at Taiwan. 4 Project in Finland Market
project picture of HLS-L380M led shoebox light:
5. Company Profile