Cheap Prefab Steel Structure Factory Building
USD $25 - $60 /Set
Min.Order:1 Set
Guangzhou Moneybox Steel Structure Engineering Co., Ltd.
Cheap Prefab Steel Structure Chicken Houses
~~~~~~~~~~~Price starts from 25USD/sqm~~~~~~~~~~~
for more information please conatct me via:
Sales : Maggie Luo
Skype: maggie_mbs
Mob/WhatsApp/Wechat: 0086 18818900941
Description
Specification
prefab chicken houses | |||
No. | Component | Description | Thickness |
1 | Main Steel Structure | 8#C Steel,Square Tube,Angle Iron,Flat Tube, Round Tube | 2.0mm |
2 | Roof Tile | EPS Tile | 20-150mm |
3 | External Wall Panel | 50-250mm EPS,PU,Rockwool or EPS Cement with Two-sides Color Steel Sandwich Panel | 0.326mm for Color Steel Sheet |
4 | Door | Color Steel Sandwich Panel Door | 870mm(W) × 2100mm(H) |
5 | Window | PVC Sliding Window | 1200mm(W) x 1000mm(H) 1748mm(W) × 925mm(H) |
Technical Paremeter | |||
No. | Description | Specification | |
1 | Bearing Load | 150kg/square meters | |
2 | Wind Pressure | 0.45KN/square meters Equal 10 Grade | |
3 | Earthquake Resistance | 8 Grade | |
4 | Temperature Resistance | (-45°C) to 50 °C | |
5 | Life Span | More Than 10 years |
Guangzhou MoneyBox Steel Structure Engineering Co., Ltd. | |
Moneybox History | More than 10 years' manufacturing experience |
Moneybox Advantages | over 10000 square meters stocks |
Strict quality control system: ISO9001/BV | |
Competitive factory price | |
Professional service team | |
Safe Packing ( meet customer's demand) | |
Special design availble | |
New design frequently | |
Moneybox MOQ | Prefab House:20 square meters |
Light Gauge Steel Villa: 50 square meters | |
Moneybox Delivery Time | Stock Item: 1-7days |
Producing: within 15days | |
Moneybox Service Faith | 1) Reply within 24hours |
2) Customer satisfaction | |
Moneybox Markets | Australia/Europe/Central America/Mid East/ Africa/ Ocenia/Southeast Asia/Eastern Asia/South Asia/ Dometic Market |
Notice
1.Don't try to disassemble any bolt or part.
2. Non-professional personnel shall not change the structure of houses.
3. Please do not run or jump in the upstairs and use fire stoves indoors.
4.Open or close the windows should be gently.
5.The loading of the floor shall not exceed the bearing weight.
6.The easy corrosion steel parts are needed regular maintenance,such as rust cleaning,painting, renovating,etc.
Other Services:
We are welcome factory visiting, as long as it's not during National Holidays !
Guangzhou MoneyBox Steel Structure Engineering Co.,Ltd.
Moneybox was found in 2005, covers more than 30,000 square meters, has a production plant more than 2000 square meters, has its own Light steel, EPS foam, glass wool board production line. We focus on the development and manufacturing of steel materials and activities of the board fabrication and installation, design, production, marketing, installation and service of integrated-owned enterprises.
Our main products are as follows:
1. Light Steel Villa/ House/ Hotel
2. 20ft/ 40ft Container House/ Box
3. Light Steel Guard House/ Mobile Store / Toilet
4. Flat/ Slope/ Hipped Roof Prefab House
5. Light Steel Structure
6. Sandwich Panel
7. Decorative Materials
Our Business Philosophy: "Quality First + Creative + Honesty + Service = Success", and gradually establish a scientific management system, more than 10 provinces and cities in the country set up a sound distribution agencies and service outlets, with a strong the service team is backing the establishment of a famous brands- Moneybox.
Our Honors: The company introduced and passed the ISO9001 quality system certification, product won the "Guangdong Famous" and "Green Product of Choice," "Chinese Famous Brand", "Chinese Construction Projects Recommended Products", honorary certificates. In the reconstruction after Wenchuan Earthquake, Moneybox’s prefab houses played a very important role,and was awarded with "Advanced Group" by Government .
Our Target: Recent years, Moneybox is also committed to expanding overseas markets, products exported to South America, Europe, the Middle East, Southeast Asia and Africa, has become a world-renowned brands. Integrity of the world, win-win cooperation, and have a better further.
Moneybox Prefabricated House---Your First and Most Ideal Choice
Q:How to buy your ideal products?
A:You can provide us your drawing, and we will produce as your drawing. Or we can design as your requirements if you do not have a clear plan.
Q:How to pay?
A:TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
Q:What is the delivery time?
A:It depends on order quantity. Generally, the delivery time will be within 7 to 10 days.
Q:How to install after the goods destination?
A: We will provide installation instruction and video for you.Technicians will be sent to help you if it is necessary. However, the visa fee, air tickets, accommodation, wages will be provided by buyers.