2015 Newest Modern style prefabricated house,light steel villa for the appartement
Negotiable /Set
Min.Order:1 Set
Guangzhou Moneybox Steel Structure Engineering Co., Ltd.
Modern & Beautiful well design prefab light steel villas/house
2014 Newest Modern style prefabricated house,light steel villa for the appartement
Enriomental Protection /Modern Latest Luxury Prefab Light Steel Villa Sold to South Africa
steel villa ,prefab light gauge steel structure house ,modern luxury prefab light steel villa
2015 Newest Modern style prefabricated house,light steel villa for the appartement
(1) Steel Structure
Light Guage Steel Villa is more stable than the one that made of welding frame steel . Besides, it is cheaper, more economic. With long lifespan, which can last almost 70 years, all the materials of light guage steel villa is Q550. It is locked with bolts, which can be used repeatedly without any maintenance.
(2) Flooring
Decoration:PVC flooring,carpet,laminated flooring ,solid wood flooring
Floor:Plywood ,galvanized deck +concrete,calcium silicate board
Insulation layer:glass wool
Floor purlins:rectangular pipes and C-shaped steel
Floor beam:rectangular tube,pipe truss,truss angles ,hot-rolled steel H
Ceiling:calcium silicate ceiling
(3) Windows and Doors
Windows: Double glazing plastic-steel or aluminum alloy thermal-insulating frames
Doors: steel security gate doors; wood or molded doors
(4) Composite Wall System (thickness:150-250mm)
Decorative layer :PVC cladding ,PU metal cladding ,single metal cladding ,calcium silicate board
Insulation:EPS sandwich panel,PU sandwich panel ,glass wool sandwich panel
Ring beam:Cold rectangular tube ,pipe truss.
Steel column:Cold rectangular pipe,hot rolled steel H
(5) Roofing System
1. Asphalt tile
2. Cement tile
3. Clay tile
4. Color steel tile
5. Glass fiber tile
Interior design:
Packing and delivery:one 40’HQ container can load all the materials for about 200 square meters
Installation: it takes 10 workers 30-45 days to install a villa for 250 square meters.
Related product: