Cheap Flatpack Container house with CE,ISO certificate
USD $3,200 - $3,800 /Set
Min.Order:1 Set
Guangzhou Moneybox Steel Structure Engineering Co., Ltd.
Place of Origin: Guangdong, China (Mainland)
Brand Name: Moneybox
Model Number: Con-005
Material: Sandwich panel ,Light steel ,PVC ,Glass
Lifespan: More than 15 years
Windows/Doors: PVC,aluminum alloy (Customized)
Use:Hotel, Kiosk,Booth,Office,Sentry Box,Guard House,Shop,Toilet,Villa,Warehouse,Carport
Certification: CE and ISO9001
Total Layers/ storeys:1
Total Construction Area: 13.05sqm
Main Structure: Light steel structure, Wall panel
Wall Panel: EPS/glass wool , rock wool, phenolic foam board etc.
Decoration:Customizable
Functions: noise/ heat insulation, anti- Seismic, easy to assembly/ disassembly
Design: Flexible design
Size: as ur requirement
Description
20ft/ 40ft standard container house is a kind of modular house ,using light steel as main structure, can be used for residential living or commerical accommodation.
Specification
Guangzhou MoneyBox Steel Structure Engineering Co., Ltd. | ||
No | Description | Specification |
Standard Dimensions | ||
1 | 20' | 6055mm(L)x2435mm(W)x2591mm(H) |
2 | 40' | 12189mm(L)x2435mm(W)x2591mm(H) |
Specification | ||
1 | Frame Structure | 2.0mm-4.0mm Cold formed profile steel / Square tube |
2 | Polishing / Derusting | |
Primer Coat: epoxy zinc-rich primer two layers | ||
Finishing Coat: alkyd honed painting white color | ||
3 | Roof | 2mm Bending steel plate |
4 | Ceiling | 50mm color steel sandwich panel(optional as carved metal insulation board) |
5 | Wall | 50mm color steel sandwich panel (optional as 75mm/10mm ) |
6 | Flooring | 15mm CCA cement fiber board+2mm PVC floor( optional as 12mm/18mm/20mm CCA+10mm composite wood ) |
7 | Door | 50mm Metal composite door(glass wool/Phenolic Foam Board) |
8 | Window | PVC glass sliding window(4mm thickness glass) |
9 | Packing | Flat down packing |
10 | Loading | 6-8 sets 20ft container house can be loaded in 1x40HQ |
Technical Parameter | ||
1 | Temperature Resistance | (-45°C) to 50 °C |
2 | Earthquake Resistance | Grade 8 |
3 | Wind Resistance | 100km/h |
4 | Floor live load | 2KN/m2 |
5 | Roof live load | 0.5KN/m2 |
6 | Life span | more than 15 years |
Product details
Advantages
1.Easy to install:every people can install 25-30m2per day.
2.Easy to disassemble,every people can disassemble a 40-50m2house in one day .
3.Service life:15-25years for once assembly ,10 years for at least 6 times assembly.
4.Environment protection and saving energy,no construction waste, reusable, materials can be recycled.
5.Competitive price,compared with traditional construction cost saving more than 50%.
6.light and reliable ,the steel structure is strong and firm .
7.Nice capacity of water proof .moisture proof and heat insulation and sound insulation
8.Diversified Specification:Our design can be customized. The doors, windows and front and back walls can be exchanged each other. And the partition walls according to the customers’ requirements.
9.Practical,good space utilization and high price performance.
Q:How to buy your ideal products?
A:You can provide us your drawing, and we will produce as your drawing. Or we can design as your requirements if you do not have a clear plan.
Q:How to pay?
A:TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
Q:What is the delivery time?
A:It depends on order quantity. Generally, the delivery time will be within 7 to 10 days.
Q:How to install after the goods destination?
A: We will provide installation instruction and video for you.Technicians will be sent to help you if it is necessary. However, the visa fee, air tickets, accommodation, wages will be provided by buyers.
Q:Why Choose Container for Site Camp Solution?
Notice
1 . Don't try to disassemble any bolt or part.
2 . Non-professional personnel shall not change the structure of houses.
3 . Please do not run or jump in the upstairs and use fire stoves indoors.
4 . Open or close the windows should be gently.
5 . The loading of the floor shall not exceed the bearing weight.
6. The easy corrosion steel parts are needed regular m ai ntenance,such as rust cleaning,painting, renovating,etc.
The final details would be decided by our further communication. Welcome to contact us!
GuangZhou MoneyBox Steel Structure Engineering Co.Ltd.