Electric heating steam power
Negotiable /Set
Min.Order:1 Set
Henan Yongxing Boiler Group Co., Ltd.
Electric heating steam boiler:
A, scope of electricity conditions
with the steam source of district steam users or regenerative electric boilers source of heat
Second, product selection points
1. The electric steam boiler choose main control parameters, boiler design for rated evaporation efficiency, rated power, steam pressure rated input.
2. Use electric steam boilers shall comply with the national and local standards, norms restrictions on request. Choose by outdated system, which is regenerative thermoelectric boiler in power grid electricity when trough, will heat stored in heat storage medium; Peak stage in grid, will be stored in the heat storage medium heat released for the user to use. The characteristics of regenerative thermoelectric boiler system is that, for peak and valley different price, can to save the operation cost, and through to the peak and valley power move for grid, economic operation.
3. Electric heating steam boiler steam regenerator, can with accumulation of more calories, but higher parameters with steam heating steam boiler of the regenerative heat exchanger system requirements of operation cost is high, the management level is taller, accordingly, not high demand for heating parameters of heating, life, air conditioning system, electric heating steam boiler plus steam of the regenerative heat exchanger system rarely used.
4. The boilers shall be made by the power supply, usable operations directly cables or metal row conveying.
5. Determine the number of load and electric boilers, should combine boiler room is when considering the transformer capacity. Many sets of boiler can share a transformer, but not allow multiple transformer common to a boiler power supply. The single machine electricity steam boiler of power is unfavorable more than 2.4 MW
6. Steam boiler water supply generally USES the pot chemical water treatment, the water table 1 provisions shall comply with.
Three, construction, installation points
1. Boiler and its auxiliary equipment, water treatment equipment installation should comply with the technical requirements of the equipment manufacturers. Equipment foundation must stay equipment delivery and design drawings checked before construction
2. Low peak put gas pipeline, water
3. After installation of pipes, by "the testing acceptance of industrial metal pipeline engineering construction and acceptance standard" GB50235-1997
4. Electric boiler room all electrical equipment within and heat storage device etc should be reliable grounding