Zhengzhou Qinyang PINGAN paper making machine parts good quality on sale for price
USD $5,000 - $100,000 /Set
Min.Order:1 Set
Qinyang City Pingan Light Industrial Machinery Co., Ltd.
Hennan Qinyang PINGAN paper making machine,paper making machine parts
2014 new type high technology cylinder dryer for paper making machine
1575mm Pingan High Quality Double Cylinder Doule Wire Toilet Paper Making Machinery
Pingan Good Price Toilet Paper Rewinding Machine Production Line for Sale
After-sales Service Provided Automatic Facial Tissue Production Machines
Alloy cast iron dryer is a function of booing stem in paper machine Low prossure vessel, the heating medium is water vapor, design pressure 0.09Mpa, it is the main material of HT250, is composed of a cylinder body and the end cover composition, sealing bolt combination fo 48 M18 to the Mix one. formed by precision grinding.
vacuum suction box is used for removing the white water within pulp by vacuum suction.
String type stainiess steel round mesh cage is the introduction of foreign advanced technology, adopt good material Quanlity, the use of advanced production technology, is a kind of new products. it fills a domestic gap.
This machine is the first set of complete equipment of on paper machine. its weight roll paper roller and friction drive roll cold cylinder rotation paper machine for uniform widing. can meet the needs of different types of paper mechine.
6.surface glue beender
performance parameters
main technical parameters | XZ117Y 1092 | XZ120Y 1575 | XZ121Y 1760 |
width(mm) | 1092 | 1575 | 1760 |
speed of glue line | 80-160 | 80-160 | 80-160 |
size of glue roller face | Ø400x1200 | Ø400x1900 | Ø400x1920 |
rail gauge | 1900 | 2400 | 2600 |
weight of gule ppaer(g/m2) | 100-200 | 40-80 | 40-80 |
1. The seller will be responsible for the installation,debugging,and production, they need to ensure it can reach the economic plan goal within planning period and offer the spare parts in time.
2. The technical training of personnel concerned: the seller will be responsible for the training on the spot of operation technical backbone from buyer. The personnel of buyer will master the related operation and repair skills after being trained. They can adjust the technical craft and deal with the fault in time.
3. We promise , after receiving the notice of quality problem from buyer, we will reply within 12 hours for common problem, and will reply within 24 hours for the important problems and will appoint the specially-assigned person to settle the problem with customer. We will offer the spare parts with discount price and faster time.
4. We promise that we will offer the lifelong tracking service.