2kw honda generator price,6.5HP honda gasoline generator set 168f
USD $95 - $160 /Set
Min.Order:50 Sets
Taizhou Nimbus Machinery Co., Ltd.
2.5kw/3kw 6.5hp honda small portable power gasoline generator 168f electric start
You also can chose recoil start honda type generator as following:
enerator | Rating frequency(Hz) | 50 | 60 | 50 | 60 | 50 | 60 | 50 | 60 | 50 | 60 | |
Rating Voltage(V) | 110/120/220/230/240 | |||||||||||
Rating power(KVA) | 2.0 | 2.5 | 2.5 | 2.7 | 2.8 | 3.6 | 4.0 | 4.5 | 5.0 | 5.5 | ||
2.2 | 2.7 | 2.7 | 3.0 | 3.0 | 4.2 | 4.8 | 5.0 | 5.5 | 6.0 | |||
Power factor(cos) | 1.0 | |||||||||||
Engine | Type | 168F | 168F-1 | 177F | 182F | 188F | ||||||
Category | Single crock,Force air-cooled four-stroke,top-intalled gasoline engine | |||||||||||
Exclusion of cylinder(cm3) | 163 | 196 | 270 | 337 | 389 | |||||||
The Max.output power(KW/rpm) | 4.8/3600 | 5.7/3600 | 7.0/3600 | 8.0/3600 | 9.5/3600 | |||||||
Ignition system | Transistorized magneto | |||||||||||
Start system | Recoil/E-start | |||||||||||
Capacity of fuel tan(L) | 15 | 15 | 25 | 25 | 25 | |||||||
Consumption of fuel(L/h) | 1.13 | 1.32 | 1.9 | 2.45 | 2.70 | |||||||
Consecutive Working(h) | 13 | 11 | 13 | 10 | 9 | |||||||
Noise(at7m)(dB) | 65 | 65 | 69 | 72 | 74 | |||||||
Capacity of engine oi | 0.6 | 1.1 | ||||||||||
Dimension | Set dimens3) | 615×435×455 | 615×435×455 | 620×470×480 | 635×510×485 | 670×510×510 | ||||||
Net weight(kg) | 39 | 40 | 62 | 78 | 80 | |||||||
Standard Equipment | Large capacitfuel tank,large capacity muffler,fuel gauge,voltmeter,AVR,oil alert,Ac circuit breaker | |||||||||||
Purchasing | Four-wheel dolly kit | Yes |
1.Q:Are you a factory or trading company?
A: We are a factory.
2.Q:Where is your factory located?
A: Our factory is in Luqiao,Taizhou city, Zhejiang Province, China.
3.Q:What is the material of your products?
A: Iron,Steel,plastic,etc.
4.Q:How about quality control in your factory?
A:We are always paying great attentions to quality controlling from the beginning to the end.
5.Q:How about guarantee?
A: It's within three months after goods is discharged in the destination.