10000L three layers blow molding machine
USD $1,400,000 - $1,430,000 /Set
Min.Order:1 Set
Qingdao Yankang Plastic Machinery Co., Ltd.
30% deposit against the contract by T/T should be paid before the order;
70% balance should be paid off by T/T after inspection before delivery;
PARISION CONTROL THINCKNESS CONTROL | MOOG | JAPAN |
PLC | SEIMENS | GERMANY |
TEMPERATURE CONTROL MODULE | SEIMENS | GERMANY |
SERVO VALVE & SERVO TRANSDUCER | MIRAN | ITALY |
INVERTER | SEIMENS | GERMANY |
HYDRAULIC OIL SEAL | DZ | TAIWAN |
INTERMEDIATE RELAY | OMRON | JAPAN |
PNEUMATIC VALVE | AIRTECH | TAIWAN |
HYDRAULIC PUMP & VALVE | YUKEN | JAPAN |
PNEUMATIC SWITCH & CONTACTOR | SEIMENS | GERMANY |
HYDRAULIC MOTOR & SCREW MOTOR | SEIMENS | GERMANY |
REDUCER | GUOMAO | CHINA |
9. AUXILIARY MACHINERY
COMMODITY | CAPACITY |
SCRAP GRINDER | 25 HP |
AIR COMPRESSOR | 30 HP |
AIR TANK RECEIVER | 8 CBM |
COOLING TOWER | 200 TON |
MIXER | 300 KG |
10. OUTPUT FOR 5000 L BLOW MOLDING MACHINE:
Commodity | Output | Unit | Weight | Unit |
3000 L Mould | 6 | PC/H | 45-50 | KG |
3500 L Mould | 6 | PC/H | 50-55 | KG |
4000 L Mould | 5 | PC/H | 60-65 | KG |
4500 L Mould | 5 | PC/H | 65-75 | KG |
5000 L Mould | 5 | PC/H | 75-90 | KG |
6000 L Mould | 4 | PC/H | 100-110 | KG |
8000 L Mould | 4 | PC/H | 125-135 | KG |
10000 L Mould | 4 | PC/H | 155-170 | KG |
DELIVERY TIME
8 months after the down payment;
TRAINNING
The Buyer could dispatch their operators to the Seller’s factory for training, including machine operation, maintenance & simple repairs;
Or against the requests of the Buyer, the Seller’s technician could train the Buyer’s operators in the Buyer’s factory in the periods of installing & adjusting;
The training is free of charge;
INSTALLATION & ADJUSTMENT
The Seller could dispatch an engineer against the requests of the Buyer to install and adjust the machines for one week in the Buyer’s factory.
The Buyer should make a reservation in advance before delivery of the machines;
The Buyer should pay for the engineer’s food & board while installation in buyer’s factory.
GUARANTEE
The guarantee time is one and half yearafter the machines normally works in the Buyer’s factory, if only the problem is cause due to quality control or any reason by the Seller. We will supply replaced parts free of charge and our engineers will guide you how to solve the problems.
Any problem caused due to irregular operation or incorrect maintenance by the Buyer won’t be listed in guarantee coverage.