Automatic Horizontal Flow Mooncake Packing Machine
USD $4,800 - $6,600 /Set
Min.Order:1 Set
Foshan SUK Precision Machinery Co., Ltd.
Chocolate stick SZ-320B packing machine/pillow packaging machine
I. Main performance and structure features
1. Double transducer control, flexible bag length cutting, operator needn’t to adjust the unloading working, saving time and saving films.
2. human-machine operation, convenient and quick parameter setting.
3.Self diagnosis failure function, clear failure display.
4. High sensitivity optical electric color mark tracking ,digital input cut position which makes the sealing and cutting more accurate.
5. Separate PID control to temperature, suitable for various packing materials.
6. Stopping the machine in selected position, no sticking to the knife and no waste packing film.
7. Simple driving system, reliable working, convenient maintenance.
8. .All the controls are achieved by software, convenient for function adjusting and upgrading.
II. Application
Suitable for packing regular objects such as chocolate bar ,biscuit, bread, instant noodle, moon cakes, industrial parts, paper box or trays.
III. Optional device
1. Code applying machine
2. Extra big screen
IV. Specification:
Type | SZ-320B | SZ-320D |
Film width | Max.320mm | |
Bag length | 65-190/120-280mm | 90-220/150-330mm |
Bag width | 50-160mm | |
Product height | Max.40mm | Max.55mm |
Film roll diameter | Max.320mm | |
Packaging rate | 40-230bag/min | |
Power | 220v 50/60Hz 2.6KVA | |
Machine size | (L)3770×(W)720×(H)1450mm | |
Machine weight | 700kg | |
Remarks | Optional air filling device |
V. Electric detailed list:
No. | Product Name | Brand |
1 | PLC | Panasonic/Japan |
2 | INVERTER | Schneider |
3 | 7 inchTouch screen | Wei Lun/Taiwan |
4 | Intermediate Relay | OMRON |
5 | Switching power | Meanwell/Taiwan |
6 | solid state relay | Schneider |
7 | Temperature controller | Yatai/Shanghai |
8 | Photoelectricity colour code | Aiset |
Machine pictrues:
1.Installation & adjustment
After the equipment are arrived at the customer’s site, the customer is responsible for unpacking and arranging the equipment according to the placement drawing; and does under our install-adjust technicians’ guidance. Costs of the staff are decided at last.
2.Training
We are responsible for offering the technical training to user. The training content includes the structure and maintenance of the equipment, control and operation of the equipment. Through training, users' technical staff can grasp and the skill of operation and maintenance proficiently, and deal with the general troubles in time. We will appoint qualified technical staff for the guidance.
3.Quality assurance
We guarantee the line achieve product technical performance indicators within 5 days after feeding operation through the correct guidance of the installation and commissioning.
We are responsible for the fault and damage of the production line caused by our design, technology, manufacture, installation, adjustment and material defect etc. that all belong to our responsibility.
The warranty period is 12 months after acceptance check of the production line. If there is any different between the furnished equipment in the customer’s factory and the equipment concerned in the contract, the users have the right to pass the inspection book to the legal department to claim for compensation to our company within goods warranty period.
4.Warranty
Offer 12 months maintenance period to the problem that caused by our design, manufacture and the material quality, and offer the relevant parts and effective service for free for above reason. We will offer a widely and favorable technical support, after service all the time after guarantee period.