1000L - 2000L HDPE Plastic automatic blow moulding machine for water tank
USD $220,000 - $250,000 /Set
Min.Order:1 Set
Weifang Xinhengda Machine Co., Ltd.
Company Information
Weifang Sehenda Machinery Co., LTD is major in plastic machinery and is one of the biggest manufacturer of plastic hollow units. Its main product is plastic machinery. The main products of plastic machinery are automatic hollow plastic unit, pull units, film unit, strapping machine, crusher, extruder. Its annual sales are nearly 100 million yuan. The company focuses on new product development and technological innovation.And the company has developed hollow units of 25L,50L, 125L, 150L, 220L, 500L,1000L,2000L,3000L,5000L in sequence. Supply comprehensive, timely and thoughtfulservice to the whole customers by our service R&D center.Full range of services throughout includes helping clients with early market research, selecting appropriate models, designing plant layout & equipment layout, Determining the auxiliary equipment, selecting and providing appropriate processing technology and product testing, etc.
Product Description
|
| SKJ2000L one layer | SKJ2000L double layers | SKJ2000L three layers |
Max. product volume | L | 2000 | 2000 | 2000 |
Screw diameter | MM | One140 | Two120 | Three110 |
Screw L/D ratio | L/D | 30:1 | 30:1 | 30:1 |
Screw drive power | KW | 132 | Two 90 | Three90 |
Screw heating capacity | KW | 30 | 40 | 60 |
Screw heating zone | ZONE | 9 | 14 | 21 |
Output | KG/H | 360 | 480 | 500 |
Oil pump drive power | KW | 45 | 45 | 45 |
Clamping force | KN | 1400 | 1400 | 1400 |
Mould open space | MM | 3200 | 3200 | 3200 |
Mould thickness | MM | 1220 | 1220 | 1220 |
capacity | L | 70 | 70 | 70 |
Die head capacity | KW | 40 | 45 | 48 |
No. of heating zone | ZONE | 5 | 5 | 5 |
Die head material | 38 CRMOALA(accumulator, lining, piston, die) | |||
Control action | MITSUBISHI PLC | |||
Blowing pressure | MPA | 0.6 | 0.6 | 0.6 |
Cooling water pressure | MPA | 0.2 | 0.2 | 0.2 |
size of machine | MM | (L*W*H)(MM) | ||
Weight of machine | MT | 28 | 33 | 36 |
LOW-VOLTAGE APPARATUS | LG | KOREA |
PNEMATIV | AIRTAC | TAIWAN |
HYDRAULIC COMPONENT | YUKEN | LAPAN |
SEAL | DICHT0MATIK | GERMANY |
OIL MOTOR | SIEMENS | GERMANY |
SCREW MOTOR | SINMENS | GERMANY |
PROXIMITY SWITCH | OMRON | JAPAN |
PLC | MITSTUBLISH | JAPAN |
TOUCH SCREEN | WEINVIEW | TIAWAN |
WALL THINKNESS CONTRAL SYSTEM | MOOG | JAPAN |
FREQUENCY CONVERTERS | ABB/LG/MITSUBISH | SWEDEN,SWITZERLAND/KOREA/JAPAN |
2.100% Moog , Siemens Drive Motor , Siemens PLC.
3.Siemens Frequency Convert, Yuken and Weinview
SKJ2000L Drums/Jerry cans/ water tank blow moulding machine
Professional service:
Low-voltage apparatus: LG Hydraulic
component: Yuken
Seal: Dichtomatik
Oli motor: Siemens
Screw motor: Siemens
Proximity switch: Omron
PLC: Mitstublish or Siemens
Touch screen: Weinview
Wall thinkness contral system: Moog
Frequency converters: Siemens
ENERGY CONSUMPTION | ||
EXTRUSION MOTOR POW. | 165KW | 55KW*3 |
OIL PUMP POWER | 55KW |
|
SERVO PUMP POWER | 7.5KW | SEPARATELY FOR PARISION CONTROL |
BARREL HEATING POWER | 90KW | 24 zone |
HEAD HEATING POWER | 50KW | DIE HEATING SEPARATELY |
COOLING FAN POWER | 2.625KW | 0.125KW*21 |
TOTAL POWER | 370.125KW | FOR ALL ENERGY CONSUMPTION LISTED ABOVE |
AVERAGE CONSUMPTION | 200KW | FOR NORMAL WORKING AUTOMATICALLY |
Certifacation
Packing & Shipping
Packaging Details: Proper packaging for voyage 1*20 Open top container.
Installation
The Seller will dispatch an engineer and translator against the requests of the Buyer to install and adjust the machine for 10 days in the Buyer’s factory.
The Buyer need to inform the Seller 15 days in advance.
The Buyer should pay for the engineer and translator’s visa application cost, round- tickets, food & accommodation before their departure.
The Buyer could dispatch their operators to the Seller’s factory for training, including machine operation, maintenance & simple repairs;
Or against the requests of the Buyer, the Seller’s technician could train the Buyer’s operators in the Buyer’s factory in the periods of installing & adjusting;
The training is free of charge.
Guarantee
The guarantee time is one year after the machines normally works in the Buyer’s factory, if only the problem is cause due to quality control or any reason by the Seller. We will supply replaced parts free of charge and our engineers will guide you how to solve the problems.
Any problem caused due to irregular operation or incorrect maintenance by the Buyer won’t be listed in guarantee coverage.
Full production process
FAQ
Weifang Xinhengda Machine Co., Ltd.
Add: Shibu Industrial Park Changyi City Shandong ProvinceChina
+8613031665754
zsy7383376
ttquan0311