Sbs bitumen rolls sbs waterproofing rolls SBS waterproof sheet
USD $1 - $1,000 /Metric Ton
Min.Order:25 Metric Tons
Dalian Bona Biological Technology Co., Ltd.
Since the modified asphalt waterproofing materials
With synthetic rubber and adding suitable amount of active agent modified asphalt with glass fiber mat as matrix (or without) PE film, metal foil as the surface material, or no film (double-sided adhesive), made of silicone oil anti-sticking isolation membrane adhesive modified asphalt waterproofing materials.As self-adhesive coil has certain extensibility, good stability, high strength, corrosion resistance, long service life, etc, applies to ban fire and all kinds of tunnel, the basement, roof, walls and other waterproof engineering.Both during the construction of polymer cement mortar paste directly use shop (wet method), and also can be used according to the traditional construction technology for shop (dry method), meet different requirements of construction projects, construction convenient, fast.
NO. | Reinforcement | PY | G | ||||||
Type | I | II | I | II | |||||
1 | Soluble Matters | 2mm | - | 1300g/m2 | |||||
3mm | 2100g/m2 | ||||||||
4mm | 2900g/m2 | ||||||||
2 | Water tightness,30min,≥Mpa | 0.3 | 0.2 | 0.3 | |||||
3 | Heat resistance degree,°C,no glide, no flow, no drop | 90 | 105 | 90 | 105 | ||||
4 | Tension, N/50mm | Longitudinal | 450 | 800 | 350 | 500 | |||
transverse | 250 | 300 | |||||||
5 | Elongation at break,≥ | Longitudinal | 30% | 40% | - | ||||
transverse | |||||||||
6 | Brittleness point | -18°C | -25°C | -18°C | -25°C | ||||
7 | Tearing strength,≥ | Longitudinal | 250N | 350N | 250N | 350N | |||
transverse | 170N | 200N | |||||||
8 | Manual work and climate quicken aging | Appearance | No.1 degree (no glide, no flow, no drop) | ||||||
Longitudinal tensionkeeping rate,≥ | 80 | ||||||||
Brittleness point | -10°C | -20°C | -10°C | -20°C | |||||
GB18242-2000 |
Method:
A: wet shop law
1. Clean the base level, basic level surface should be solid, clean.And fully wet without water.
2. Wipe the slurry paste layer: the slurry on the base, the width of the cement slurry is longer than adhesive waterproof coiled material, the short side of the 300 mm wide, and use the guide rail to ensure smoothness of cement slurry.(note: the thickness of the cement slurry for 3-5 mm.)
3. Remove the waterproofing materials on the surface of the insulation material, the coil flat out on the cement slurry, coil in parallel between the coil and docking, the seam should be controlled within 3 to 5 mm.(also can adopt overlapping way, isolation paper peel will take it, to paste the coil and the coil is about 60-80 - mm).Flap with wood float or rubber on the coil surface, exhaust gas and plasma.The coil and cement paste.4. Air put 24 to 48 hours.The higher the temperature the shorter the time required.
5. Interface sealing: can use additional adhesive sealing tape sealing.When the interface sealing, the first isolation of paper on the surface of the coil on the overlapping parts jie in addition to, and then paste adhesive sealing tape sealing.If the overlapping parts contaminated, need now to clean up pollution area, and then stick waterproofing sealant.
6. Nodes in the bedding face coil construction intensive processing is completed.Roof gutter, parapet, eaves, flue, vent parts such as the need for additional processing.To strengthen the need to use waterproof sealant.