Tailing Thickener for dewaterting

Tailing Thickener for dewaterting

USD $100 - $10,000 /Set

Min.Order:1 Set

Supply Ability:
30 Set / Sets per Month
Port:
Qingdao or other ports
Payment Terms:
T/T

Quick Details View All >

Condition:
New
Application:
Ore Mining, Ore mining
Motor Type:
AC Motor
Power(W):
1.1kw-15kw
Production Capacity:
10-3000 T/d
Place of Origin:
Shandong, China

Yantai Jinpeng Mining Machinery Co., Ltd.

Business Type: Manufacturer,Trading Company
Yantai Shandong China
Main Products: Ball Mill ,Classifier ,Flotation ,Crusher ,Thickener ,Professional Equipment for Gold Extraction ,Filtration Equipment

Product Details

Yantai Jinpeng Mining Machinery CO., LTD

Professional mineral processing design, equipment production,installation and conmissioning institue. 

 

 

Tel: 0086-535-3975297 & 0086-535-13964566356  Skype: Song.maria1

 

 

 

High efficiency thickener with central transmission

 

Tailing Thickener for dewaterting 

The central drive thickener mainly used in the process of concentrate and tailings’ dehydration, meanwhile it can also be used for dehydration, desliming, and sewage treatment in hydrogenated industry and coal separation plant.

 

Tailing Thickener for dewaterting

 

Tailing Thickener for dewaterting

 

In the bottom center of a discharge concentration of the product discharge bucket, pond surrounding the upper ring with the overflow tank. Concentrated in the central pool has a vertical axis, the axis of the cross at the end of a fixed frame rake, rake the following aircraft equipped with a scraper. Rake into a horizontal plane and 8 ° -15 °. Fixed by the vertical axis in the truss on the motor reducer by the middle gear driven rotary. When the vertical axis rotation, the pulp along the truss to the mine shafts into the center of the bowl pool, and to concentrate around the pool flows. Pulp in the settlement of solid particles gradually condensed into the bottom of the pool by the following scraper plane rake scraping into the center of the pool discharge bucket with sand pump. To clarify the above clarificationwater from the Department of the Central Bank out of the overflow tank. In the thickener have been concentrated load or materials, the discharge will fight blockage and rake frame distortion. To prevent this phenomenon, there are signals of safety devices and equipment to upgrade rake frame.

 

Tailing Thickener for dewaterting

 

(1)Deaeration cell is provided to avoid bobble on which solid particles may attach and settls as “parachute phenomena”.

 

(2)The mineral feeding pipe is beneath the liquid surface to provent air to be brought in by feeding.

 

(3)Inner overflow weir is equipped to let slurry flow on pre-designed route, avoiding “short circuit”.

(4)The pattern of the overflow weir is made into indented shape, eliminating suction phenomena in some part of draining induced by unleveled overflow weir.

 

Tailing Thickener for dewaterting

 

 

Diameter of concentrated tank

M

6

Central depth

M

2.96

Filter area

mm2

28.2

Rake speed

r/min

0.35

Motor

Model

 

Y160M-6

Power

KW

7.5

Rake lifting height

mm

280

 

 

Usually used in the following similiar process of gold,silver,copper, lead zinc, molybdenum and so on.

 

Tailing Thickener for dewaterting

 

 Tailing Thickener for dewaterting

 

 Tailing Thickener for dewatertingTailing Thickener for dewaterting

 Tailing Thickener for dewaterting

Tailing Thickener for dewaterting

1. Installment:

Thickener installed on the site as a whole.

Keep the spindle, rake concentric with the discharge basket.

Note: The thickener can not run reversely.

2. Trial Run

No-load trial: the run time should be 8 hours, the temperature of motor and transmission parts should not exceed 50 °C.

Load trial: testing time is 8 hours, filled with liquid water.

3. Running

Check whether the discharge pipe and the transmission mechanism works normally, and must be confirmed there is no foreign matter in the pond before start the equipment.

Pay attention to the equipment’s load, the overflow and concentrate’s concentration.

One of the major fault of the equipment is the discharge bucket’s block, many reasons may cause that, such as coarse-grained particles, wood chips, rags falling into, the block is more likely to occur when the sand pump not working. When the block happens, must shut down the gate on the concentrate pump and then feed the high-pressure water into the discharge bucket to solve the block problem. If foreign matters falling into the thickener, should discharge the pulp completely then clean the tank.

Fasten the bolts timely after the operation.

 

Tailing Thickener for dewaterting

 Tailing Thickener for dewaterting

 

 Welcome to visit our company, and discuss the win-win cooperation!

 

 

 

Contact Supplier

Mr. Matthew Zhu Sales Manager Chat Now
Telephone
86-535-3975290
Mobile
0086-15106533168
Fax
86-535-3975290
Address
No.11 FUZHOU ROAD, DEVELOPMENT ZONE. YANTAI CITY, SHANDONG PROVINCE, CHINA Yantai,Shandong

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Energy & Mineral Equipment > Mining Machinery > Mining Thickener
Categories
Hi~