grinding mill for gold with the low price and high quality
USD $10,000 - $100,000 /Set
Min.Order:1 Set
Yantai Jinpeng Mining Machinery Co., Ltd.
Professional mineral processing design, equipment production,installation and conmissio ning institue.
Tel:0535-3410108
Skype:bixueqq
Gold mining high efficiency ball mill sold to more than 30 countries
Ball mill is widely used in mining, smelting,road,building material and chemical. It is the key equipment for grinding after the crush process.The mill consists of feeding device, driving assembly, rotating assembly,bearing unit,discharging assembly and foundation unit.There are two discharging type: wet grid ball mill and dry grid ball mill.
(2)Large capacity: for the outlet disk and the checked liner are adopted, the capacity is higher 20% than the cone ball mill.
(3)The discharging port slurry surface is low, slurry flow through rapidly, decrease ore over-grinding.
(4)Load of ball is large, big balls, small balls be loaded in, and small balls can’t be discharged, and can form good working conditions.
The model is as follows:
GZM0912 | GZM0916 | GZM0918 | GZM0921 | GZM1216 | GZM1220 | GZM1224 | GZM1226 | GZM1228 | GZM1520 |
GZM1523 | GZM1526 | GZM1529 | GZM1535 | GZM2131 | GZM2136 | GZM2727 | GZM2733 | GZM2743 |
straight energy conservation ball mill
the model is as follows:
GMG0918 | GMG1224 | GMG1228 | GMG1520 | GMG1530 | GMG1536 | GMG2130 | GMG21 |
wet grid (overflow) ball mill
the model is as follows:
MQG(Y)0909 | MQG(Y)0918 | MQG(Y)1212 | MQG(Y)1224 | MQG(Y)1515 |
MQG(Y)1530 | MQG(Y)2122 | MQG(Y)2130 | MQG(Y)2430 | MQG(Y)2736 |
dry grid ball mill
the model is as follows: MQG0909 MQG0918 MQG1212 MQG1224 MQG1515 MQG1530
rod mill
model is as follows: Yantai Jin Pengwei you provide the exquisitest ball mill technique of manufacture and the most just ball mill price!
MBY0918 | MBY0924 | MBY1224 | MBY1530 | MBY2130 |
Usually used in the following similiar process of gold,silver,copper, lead zinc, molybdenum and so on.
Startup of ball mill
A. Check if all connecting bolts are tightened before startup of ball mill, and if there is any loosening with all connected parts.
B. Check if lubrication of oil site meet requirements.
C. Check if there is anything around ball mill and sorting machine, which may prevent the machines from running.
D. Startup sequence for devices of loop; start ball mill before sorting machine, followed by ore feeding after normal running.
Stop of grinding loop:
If grinding loop stops running, stop ore feeder first. Then stop ball mill after the ores are processed inside the drum of ball mill. Take out the screw axis of the sorting machine out of the sand surface. Stop the sorting machine finally.
;
Provide ore dressing experiment,process design and onsite engineering service.
Quality Certificate
Jinpeng always treats quality as our priority. Our company's philosophy is to make money by helping our customers make money.
We use the best motors, gears, and other spare parts in China. We can also fix the specified motor or other parts according to customers' requirements.
The raw material like steel plate is also of high quality and conforms with the higher standard.
i