AC110v~270v 4ft double side LED tube integrated T8 tube SMD2835 island freezer plastic led tube light
USD $17 - $21 /Piece
Min.Order:25 Pieces
Zhuhai SEPICN Electronics And Technology Co., Ltd.
AC110v~270v 4ft double side LED tube integrated T8 tube
SMD2835 island freezer plastic led tube light
Specification
Model | HC-T8-CL-4FT |
Length | 4FT |
Power | 18W |
Voltage | 100-277V |
Color Temperature | 3000K-6500K |
LED Type | Epistar 2835 |
Cover | Clear & Frosted |
Lumens | 2340 |
Bean Angle | 240 |
CRI | >80 |
Rated Life | 50000 Hours |
Certification | UL cUL CE Rohs |
warranty | 5 Years |
Features
1.Led double-insulated internal driver
2.Rotatable end cap and standard cap available
3.High power factor >0.95, low THD<15%
4.Instant on / instant off. No Warm-up time
5.Wide voltage: AC100-277V
6.Retrofit kits available for direct replacement of T8/T10/T12 fluorescent fixtures
7.Working Temperature :-20 to 45 degree
8.Double side V shape 240 degree beam angle lighting
9.Ballast compatible :work with magnetic and electronic ballast, work with 347V ballast
10.No need to re-wire, replace directly, easy installation bypass is optional
Color Temperature:
WW:3045 ± 175K
NW:3985 ± 175K
DW:5028 ± 285K
CW:6000 ± 250K
Dimension
Model | DIM A (MM) | DIM B (MM) | DIM C (MM) | DIM D (MAX) |
4FT | 1198 | 1205.5 | 1213 | 27.2 |
5FT | 1448 | 1455.5 | 1463 | 27.2 |
6FT | 1752 | 1759.5 | 1767 | 27.2 |
Advantage
| Aluminum thickness | Aluminum | Efficiency | Driver | Cover | PCB and wire | Warranty |
SEPICN’S tube | >0.83mm | Pure Aluminum | 130lm/w | UL driver | UL VO fireproof grade | UL standard | 5year/DLC |
Other’s tube | 0.6mm | Impurity Aluminum | 90lm/w | Fake UL driver | Not UL VO fireproof grade | Not UL standard | 3year |
Special Advantages of our T8 LED tube :
1. Special circuit design, each LED work separatel
2. Energy saving
3. 50,000 hours life span
4. Instant start, no flickering, no buzzling
5. No lead, mercury, no UV & IR radiation
6. High efficiency(95%)heat protection system
7. 5years warranty
8. DLC, UL approved
Trade tems & conditions
1. Payment term: 100% for sample; For bulk order: 30% deposit and 70% balance before shipment.
2. Payment way available: T/T, Paypal, Western Union.
3. Lead time: 3~5 working days for samples, 10-15 working days for quantity order.
4. Shipping port: Shenzhen, Via Sea, Air and Air express (DHL, FEDEX, EMS, UPS, TNT) or other ways.
5. MOQ: 25 piece.
6. Discounts: Based on the quantity, normally above 1000pcs, Special discount will be available.
UL/DLC Certification