fridge side panel rolling&forming manufacturing line
Negotiable /Set
Min.Order:1 Set
Anhui Sunmine Mechanical And Electronic Equipment Manufacturing Co., Ltd.
Supplier:Anhui Sunmine Mechanical and Electronic Equipment Manufacturing Co.,Ltd.
Contact preson: Mona Zhou
Add: No 22.outang Road .City East Industrial Park.Economic and Technological Development Zone .Chuzhou .Anhui .China.
Tel:86-550-6822028
Fax:86-550-6822026
Skype:Mona(Sunmine)
Mob:86-18365268171
Wechat:a2016fly
Website :
SUNMINE is the biggest home appliance equipment supplier in China, owned three factories, two for equipment manufacturing, one for mould manufacturing. Occupied totally more than 60,000 square meters.
Sunmine workplace building
Factory A:
Factory B:
Factory C:
Our customers:
This kind of production line is used to roll and form metal sheet of refrigerator and freezers, like door shells, side panels, back panels, etc.
Mainly consisting of loading station, punching station, 180º overturning station, rolling station, cutting station, bending station, 90º bending station, flanging station, unloading station, pneumatic unit, hydraulic unit, electric control unit, etc, which can be customized according to Buyer’s products.
Working procedure: loading automatically, punching, sheet turning, rolling, forming, cutting, stage foaming, end
bending, unloading and so on. What is more, the procedure may be different with forming sheets.
Main technology parameter:
Usage | To roll and form metal sheets used on refrigerators and freezers, like: side panel; back panel; top panel; door shell; etc. |
Customized | Yes |
Outer Dimension of Line | 48000×3500×2000mm(L×W×H) for reference |
Height of Working Table | 900mm above the ground |
Station | 9 |
Forming Width | 400~650 mm |
Formed Length | 500~2200 mm(Single Side) |
Cycle Time | 20 s/set |
Sheet Material | cold rolled sheet;pre-painted sheet or PCM with film |
Size of forming sheet | L=500~4500mm; Width=400~650mm. |
Thickness of Sheet | 0.45~0.6mm |
Total Power | 50Kw |
Total Air Supply | 2m3/h |
Industrial Water: | 10m3/h |
Labor Required | 1 |
Prevailing Color | Green; Grey. |
Delivery time :Within six months after getting 40% advance payment
Payment terms :40% T/T deposit in advance .60% balance before shipment or L/C at sight
Port:Nanjing .Shanghai or Ningbo