Al2O3- C Materials Continuous Casting Refractories
USD $1,000 - $5,000 /Piece
Min.Order:50 Pieces
Jinan Linquan Import And Export Co., Ltd.
Al2O3- C Materials Continuous Casting Refractories
Submerged Nozzle / Submerged Entry Nozzle/Submerged Entry Shroud is manufactured in Alumina Carbon (Al2O3-C) quality and isostatically pressed. Special protective coating is applied to provide oxidation resistance and decarburisation.
Sub-entry Nozzle/Sub-entry Shroud is used to control flow of liquid steel from "Tundish to Mould". It prevents re-oxidation of steel between the tundish and the mould.
SEN plays an important role in protecting the molten steel from air oxidation when it flows from the tundish to the mould. It also averagely distributes steel into the mould and control the steel fluid state in the mold.
LQ series of SEN features good thermal shock resistance, stability, corrosion resistance and anti-mechanical fracture. Every batch of products have passed rigorous NDT X-ray test before launching into the market.
Main physical and chemical properties of submerged nozzle:
Spec. | Submerged nozzle | Slide plate for blowing argon gas | ||
Al2O3 –C (body) | ZrO2–C (slag line) | Al2O3 –C | Al2O3 –ZrO2–C
| |
Al2O3 % | >45 | - | >85 | >80 |
C+SiC % | >26 | >15 | >5 | >5 |
ZrO2 % | - | >70 | - | >5 |
Apparent porosity % | <18 | <20 | <8 | <7 |
Bulk density g/cm3 | >2.5 | >3.20 | >3.0 | >3.1 |
Normal temperature Compressive strength (MPa) | >20 | >20 | >80 | >80 |
Normal temperature blending strength (MPa) | >7.0 | >7.0 | >7.0 | >10.0 |
Plock/matching products: Monoblock Stopper (LQMS):
Chemical and Physical Properties | LQMS |
Apparent porosity % | 12-18 |
Bulk Density (gm/cc) | 2.25-2.35 |
Cold Crushing Strength (kg/cm2) | 180-280 |
Cold Modulus of Rupture (kg/cm2) | 80-130 |
Al2O3 % | 48-54 |
SiO2 % | 10-14 |
Fe2O3 % | 0.20-0.30 |
L O I % | 30-35 |
N.B.:
1) Serivice life depends on steel-making condition, refractory slide gate and different operation mode.
2) For composited slide plate, we can mark different material in different part and detailed index according to the drawings.
3) Delivery time depends on the drawings. If new moulds are needed, an additive period may be necessary. In general it is 35-50 days.
Jinan Linquan Industry and Trade Co., Ltd
Linquan Trade, Serve World