Sandwish panel roof tile making machine
USD $35,000 - $55,000 /Set
Min.Order:1 Set
Botou Dongchang Machinery Manufacture Co., Ltd.
Sandwish panel roof tile making machine
1Roll speed:0-4m/min
2Frame:300H steel welding
3PLC control system
4Good quality,easy operate
5High efficiency,low noise
EPS 980 sandwich panel roofing tile machine
This efficient new composite building materials is mainly applied in public buildings,
industrial workshop roof ,walls,clean workshop and combine the cold storage,the
building class,shops,etc.
Feature
moisturizing ,waterproof once completed
construction speed is quick,high efficiency
wear well
beautiful appearance
easy operate
low energy consumption
Specification
Installation dimensions:48000mm*2700mm*4500mm
Operation voltage:380V 50Hz,3 phases
Total power consumption:32kw
Total Weight:31 tons
Forming part:
Size:9200mm*1400mm*1300mm
Frame:360 I Beam
Step of Rollers:27 steps
Roller material: 40Cr
Material of Shaft : high grade No.45 steel
Roller diameter:80mm
Composite Part:
Sizes:8000mm*2300*3200mm
Step of Rubber roller:28 steps
Thickness of rubber roller:1 inch
Two way moving shaft:9 steps
Working speed:0-4.5m/min
Steel Material thickness:0.3-0.8mm
Core thickness:50-300mm
Core material:EPS,rock wool and glass wool
Control system: PLC with touchscreen,Convertor
Shipment: 40 HQ*2 containers
Assistant equipment with machine
Slitter 1 set
C-channel forming machine 1 set
Cutter 1 set
Lift hook 1 set
Decolier 1 set
Bracket 2 pieces
Packaging & Shipping
Delivery: about 25 days after receipt of advance payment
Service: we sent technician to your country to fix the machine.
The buyer should bear all the cost including: visa , Roundtrip ticket and suitable accommodation, also buyer should pay the salary 60USD/day.
Warranty: 18 months limited warranty
During warranty: parts are free but buyer pay for the shipping fee
Our Services
1.Warranty period of 2 years, if the parts damage is found in the warranty period, we provide free accessories
2.The device passes through a third party testing before leave factory, such as CIQ, IOS, BV, SGS, etc
3.The factory will accessories display equipment, such as bolts, shaft, pneumatic cylinder, bearing, electronic switch, limit switch, operating instructions, etc
4.The equipment need on-site installation debugging, after the equipment arrived at customer factory, my factory technical personnel will arrive at 5-6 working days.Technical personnel daily salary shall be borne by the manufacturer, round-trip airfare and accommodation shall be borne by the customer.Technical personnel arrived at the scene, the purchaser shall provide the support such as staff, tools and lifting equipment, commissioning the installation is complete, technical personnel on-site operation guidance.The overall finish testing, technical personnel to return home.
Contact type