Advanced Germany machines factory directly controls temperature controller
USD $1,000 - $1,500 /Case
Min.Order:1 Case
Zhejiang Supcon Instrument Co., Ltd.
E6500 Smart color display Data Acquisition Unit PID process controller
SUPCON color Display Paperless Temperature Recorder
Item Name | SKC Differential Pressure (Flow) Transmitter | |||||||||
Material | Metal | |||||||||
Size | L121*W94*H190cm | |||||||||
Color | silver and atrovirens | |||||||||
Process | Casting,Stamping,Polishing,Filling Silicon Oil,Painting,Assembly,Calibrating,Packaging | |||||||||
Custom Desigh | Welcome | |||||||||
Service | OEM&ODM | |||||||||
MOQ | 1pcs | |||||||||
Sample | Available | |||||||||
Sample Cost,The cost will be returned after placing an order | USD300 | |||||||||
Sample Lead Time | 7-15 Days | |||||||||
Payment Terms | T/T, LC at sight,west union,paypal | |||||||||
Packing | carton package with protection material | |||||||||
Production Time | 15-30 Days | |||||||||
Delivery Port | Ningbo or Shanghai |
Q: Are you a manufacture or a trading company?
A: We are a 20-year-manufacturer engaged in the field of cleaning products, and we have got the permit of import and export as well.
Q: Where is your factory located? How can I visit there?
A: Our factory is located in Hangzhou, China. 25 Minutes by car far away from Xiaoshan Airport.
Q: How can I get the Advanced Germany machines factory directly controls temperature controller samples? What's the lead time?
A: Samples could be sent within one week, the lead time is 35-45 days..
Q: Do you provide Advanced Germany machines factory directly controls temperature controller ODM/OEM service?
A: OEM/ODM is welcome, there are 25 persons in our R&D team, and customized colours is optional. From the concept to finished goods, we do all (design, prototype reviewing, tooling and production) in the factory.