2012 Xiamen Sinywon 190W - 200W Solar Panel with TUV and CE
USD $0.6 - $1 /Piece
Min.Order:20 Pieces
Xiamen Sinywon Electronic Co., Ltd.
2012 Xiamen Sinywon 190W-200W Solar Panel with TUV and CE
1.5 yrs Quality Warranty
2.CE,TUV,UL,IEC Certification
3.High Efficency Solar Cells 15%
4.Life Span 25 yrs
Specification:
ITEM NO. | SYW190-54p | SYW195-54p | SYW200-54p |
Maximum Power (W) | 190 | 195 | 200 |
Optimum Power Voltage (V mp) | 26.1 | 26.15 | 26.23 |
Optimum Operating Current (I mp): | 7.31 | 7.48 | 7.63 |
Open Circuit Voltage (Voc) | 33.2 | 33.25 | 33.3 |
Short Circuit Current (ISC) | 7.83 | 7.95 | 8.03 |
Cell Efficiency (%) | 15 | 15.4 | 15.8 |
Module Efficiency (%) | 12.9 | 13.3 | 13.6 |
FF (%) | 70-76% | ||
Solar Cell | 156*156 poly si | ||
Backing (Material) | TPT | ||
Frame (Material Corners, etc.) | Aluminum-alloy | ||
Number of Cell (PCS) | 6*9 | ||
N/W(KG) | 16 | ||
Junction Box Type | Pass the TUV Certificate | ||
Tolerance Wattage (e.g. + /-5%) | ±3% | ||
Front Glass Thickness (mm) | 3.2 | ||
Surface Maximum Load Capacity | 2400Pa | ||
Allowable Hail Load | 23m/s, 7.53g | ||
Packing | 1*20' | 226pcs | |
1*40'STD | 460pcs | ||
Temperature Coefficients of ISC(%)°C: | 0.04 | ||
Temperature Coefficients of Voc(%)°C: | -0.38 | ||
Temperature Coefficients of Pm(%)°C: | -0.47 | ||
Temperature Coefficients of IM(%)°C: | 0.04 | ||
Temperature Coefficients of VM(%)°C: | -0.38 | ||
Temperature Range | -40°C to +85°C |
Dear, warmly welcome your visiting. Here Cathy is on your service.
Will you send me an inquiry for more detailes?
Our Service:
1 Reply your enquiry in 24 working hours.
2 Experienced staffs answer all your questions in fluent English.
3 Customized design is available. OEM&ODM are welcomed.
4 Exclusive and unique solution can be provided to our customer by our well-trained and professional engineers and staffs.
5 Special discount and protection of sales area provided to our distributor.
Trade Terms:
1. Payment: By T/T or Western Union or Paypal for sample.30% deposit and 70% balance for bulks before shipment.
2. Lead time: 5~15 working days, subject to the order quantity.
3. Delivery ways: DHL, UPS door to door service, by sea, by air, etc.
4. MOQ: 10pcs