CE approval Snow Blower, Gardenpro KC1334GS
Negotiable /Piece
Min.Order:72 Pieces
Zhejiang KC Mechanical & Electrical Co., Ltd.
CE approval Snow Blower, Gardenpro KC1334GS
1. LONCIN snow power 375cc (13hp)
2. Motor control to chute
3. With differential
GASOLINE SNOW THROWER, CHUTE MOTOR CONTROL, 13HP | |
Model No. | KC1334GS |
Engine | LC185FDS LONCIN snow engine, 1-cylinder, air-cooled, 4-stroke |
Displacement | 375CC |
Max. Power | 7.8kw/3600rpm |
Fuel Tank Capacity | 5.5L |
Working width | 86.8cm / 34" |
Working Thickness | 51cm / 20" |
Throwing Distance | 15m |
Speed | 6 forward 2 reverse |
Chute Material | metal |
Light | with 12V head light |
Transmission Type | friction disc |
Chute Rotating Angle | 190 degree |
Chute deflector direction change | motor control on panel |
Chute cap control | motor control on panel |
Type of wheels | 16x6.5-6 snow hog wheel |
Differential | with differential gear system |
Starting mode | recoil + eletric or battery |
Container loading | 72pcs/40'HQ |
>About us | |
Feature | 1. Experience more than 10 years |
2. Keeping developing new design | |
3. Factory with cheap price | |
4. QC control every order | |
5. Not only assembling, we produce 90% of the parts by ourselves, ensure the quality in each step. | |
Partners | MD, Champion, GGP, JULA, Lumag, B&S |
Established date | The year of 1991 |
Factory or trading company | Factory |
Factory size | 5000 square meters |
Quantity of worker | More than 400 people |
No. Of production Lines | 7 lines |
Located | Yongkang, China |
Main product | 1. Snow thrower |
2. Snow Sweeper | |
3. Lawn Mower | |
Main market | Eastern Europe: Russia, Belarus, Czech, Ukraine, Poland |
Western Europe: France, Netherland | |
Northern Europe: Norway, Sweden | |
Southern Europe: Italy, Greece | |
Asia: Japan, Korea | |
Others | |
Own design department | Yes |
Certificates | ISO, CE, GS, EPA, etc |
Annual output value | US$15Million - US$30 Million |
OEM | Yes |
Our own brand | GARDENPRO |
>About shipping | |
Acceptable trade term | FOB, C&F, CIF |
Acceptable Payment | T/T, L/C |
FOB port | Shanghai / Ningbo |
Delivery lead time (order) | 45days |
Delivery lead time (sample) | 15 days |
Package | 1 pc / ctn |
Normal packing | extra strong 7-layer corrugated cardboard carton with pallet |