new design plastic soap mold
USD $1,000 - $40,000 /Set
Min.Order:1 Set
Taizhou Huangyan Jinnuo Mould Co., Ltd.
new design plastic soap mold
silicon mold soap molds
We can tailor various kinds of plastic injection mold for each customer as per their requirements.
You will know more about us if you visit our website:.
Pls contact Judy (+86-138 5761 3213) if you need any moulds.
Jinnuo's advantage:
1. High quality
2. Cheap price
3. Short delivery time
4. Excellent seivice
Name | Description |
Mould material | 45#, 50#, P20, H13, 718, 2738, NAK80, S136, SKD61 etc. |
Mould base | LKM, HASCO ect |
Cavity | Single/multi |
Runner | Hot/cold |
Design software | UG, PROE, CAD, CAXA ect. |
Plastic material | PP, PC, PS, PE, PU, PVC, ABS, PMMA ect. |
Mould life | 300,000-3,000,000 shots |
Delivery time | 15-60days |
Specification | Depends on customer's requirements |
Item | Step for making new design plastic soap mold | |
1 | Received Inquiry | Analyse Customer requirement and drawing with specification on time |
↓ | ||
2 | Quote within 24 hours | Include payment and mould material product material , warranty delivery time, shipment .etc |
↓ | ||
3 | Send customer Schedule | Get customer order ,Make the plan and arrange to do, then send the schedule to client. |
↓ | ||
4 | Confirm drawing | Clients confirm the mould drawing ,once get reply will doing soon. |
↓ | ||
5 | Prepare material | According mould drawing to prepare mould base ,inserts and pins. |
↓ | ||
6 |
Making Machining | mould base ,cavity insets and core insets,even slide block by CNC EDM,wire cutting, surface polish and other treatment, finally assemble. |
↓ | ||
7 | First sample and dimension | Make samples and measure all dimension according drawing , make the dimension reort ,,
|
↓ | ||
8 | Customer Confirm Samples | Approve the samplees |
↓ | ||
9 | Delivery | Delivery goods by sea or by air,according customers requirement. |
Maintenance of the injection mould:
1) before working
a:clean up the mould surface and make sure cool system is in good quality.
b:inspect the runner sprue,make sure it can work well.
2) during working
a:exam the guide pin,guide bush,slide, oil the mould two times a day.
b:inspect the parting line,ejector tank,and runner surface
c:inspect the cool system,screw
d:exam the locating switch
3) after working
cool system must be closed before it discharged from the injection machine.clean up the surplus water in the mould,inspect the mould surface make sure there is not any remnants and oil the working part.