Simplex sc apc fast connector, hot melt fiber optical sc fast connector
USD $1 - $3 /Piece
Min.Order:20 Pieces
Dongguan Qingying Industrial Co., Ltd.
quick SC/APC Optical Fiber Fast Connectors
The fast connector is embedded optical fiber, to ensure a controlled factory ceramic polishing face, the radius of
curvature, apex offset, optical fiber end surface polishing projection height and the ceramic mass
The use of high concentricity of the ceramic ferrule embedded fiber ensures a low insertion loss and high return loss
optical performance accuracy of the V-groove to be cut on site slide locking mechanism fixed to the fibers have the
V-groove of the fiber core center the combination of precise fiber core with matching refractive index matching cream
can guarantee quick connectors with high stability and high performance bare fiber, coating, pigtails, skin quadruple
cable clamp, special assembly fixtures to meet the requirements, the operator simple and quick.
Factory Scale: Total Area of: 8000 square meters Factory history: 10 years Production Staff: 60 to 100 | Certificates: ISO9001:2015 SGS RoHS CE | |
Logistics Ability: Arrange the Mixed logistical for Election delivery as By Air and By Sea, over 10 years’ experience for logistical arrange. | ||
Features; Good uniformity and low insertion loss Low Polarization Dependent Loss Excellent Environmental Stability Excellent Mechanical Stability | Delivery Time: Material Preparation Time: 3 days (or inventory) Production & Assembly Time 7 days Testing & Packaging Time: 2 days Total Delivery Time: 12 days in 20,000pcs for safe delivery lead time. The faster delivery could be negotiable. | |
Applications: 1.Asynchronous Transmission Mode(ATM) Package for 5000PCS : 2.Passive optical networks (PON) Fast Connector Package dimensions :46 X 33 X 23 CM 3.Fiber to The Home (FTTH) 4.Local Area Networks (LAN) 5.Cable Television (CATV) 6.Test Equipment |
Q 1. what's the payment term?
A. We accept TT, 30% deposit and 70% balance aganist copy of BL, Western
Union.
Q 2. how's the delivery time ?
A. usually it will take about 10~15days for production
Q 3. tell me the standard of package?
A. For the small capacity, it use carton.