120t/h CL-1500 mixing plant for construction and road machinery
Negotiable /Set
Min.Order:1 Set
Beijing Ca-Long Engineering Machinery Co., Ltd.
1. Designed for easy operating and maintenance. It has same performance as the large one.
2. The vibrating screen is 2 decks with 4 segments, which could screen 4 kinds of aggregates.
3. Downside hot mix storage silo could use less energy, less space and has lower fault rate.
CL Series
Ingenuity design, distinctive style type, easy installation and transportation, environmental friendly.
CL Series | ||||||
Type | Rated Capacity | Mixer Capacity | Mixing Cycle | Hot Bin | Hot Mix Storage Silo | Weighing Accuracy |
CL-700 | 56T/H | 700Kg | 45S | 8 m3 | 30T-180T | Aggregate≤±0.3% Bitumen≤±0.25% Filler≤±0.25% |
CL-1000 | 80T/H | 1000Kg | 11m3 | |||
CL-1500 | 120T/H | 1500Kg | 13m3 | |||
CL-2000 | 160T/H | 2000Kg | 22/40m3 | |||
CL-3000 | 240T/H | 3000Kg | 60m3 | |||
CL-4000 | 320T/H | 4000Kg | 70m3 | |||
CL-5000 | 400T/H | 5000Kg | 75m3 | |||
CL-7500 | 600T/H | 7500Kg | 98m3 |
Our service
After-sales service
Company information