China Design Low cost construction design steel structure warehouse
USD $30 - $50 /Square Meter
Min.Order:300 Square Meters
Weifang Tailai Steel Structure Engineering Co., Ltd.
Steel structure building is formed by the main framework through linking up the H beam, C purline, Z purline steel components. Roof and wall using a variety of panels together with other components such as windows and doors. The steel building has the advantages of wide span, high strength, light weight, low cost, temperature protection, save energy, beautiful appearance, short construction time, good effect of insulation, long using life, space-efficient, good seismic performance, flexible layout, etc.
1) Enviromental friendly
2) Lower cost and maintenance
3) Long using time up to 50 years
4) Stable and earthquake resistance up to 9 grade
5) Fast construction, time saving and labor saving
6) Good appearance
Established in year 2003, Weifang Tailai Steel Structure Engineering Co., Ltd, with registered capital 16 million RMB, located in Dongcheng Development district, Linqu County,Taila is one of the largest steel structure related produsts manufacturer in China, specializes in construction design, manufacturing, instruction project construction, steel structure material and so on ,has the most advanced product line for H section beam, box column, truss frame, steel grid, light steel keel structure. Tailai also has the high precision 3-D CNC drilling machine, Z & C type purlin machine, multi-model color steel tile machine, floor deck machine, and fully equipped inspection line.
Use H Beam Assembling Machine
Use H-Beam Welding Machine
Use Vertical Straightening Machine
Use Carbon Dioxide arc welding
Use Ultrasonic flaw detector
Use H sectiong steel shot blasting derusing machine
Use High-pressure airless spraying
One coat of iron red primer, two coats of finished paint
We are professional manufacturer of steel structure building.
Q2:Are steel structure buildings expensive?
The steel structure of Weifang Tailai company is economic. Its technology and materials used decreases cost of the building . All the material including the steel frames, wall body and roof for installation are prefabricated during the production process, therefore the labor costs for installation is decreased.
Q3:What if I have questions during the installation of my building?
we can send our engineer to your country to guide the workers, or we also have professional service team ,they will help you install the steel structure building .
Q4:Is there any warranty available on the steel structure buildings?
The steel structure buildings have limited warranty. Usually, we build the house complied with the GB Chinese standard