Ball bearing rack and pinion drawer system,Sliding racking,
USD $500 - $2,000 /Set
Min.Order:1 Set
Nanjing Whitney Metal Products Co., Ltd.
Ball bearing rack and pinion drawer system !!
Our Promise as below: ( ^_^ )
1) Quotation will be sent out within 24 hours.
2) 15-20 days delivery time.
3) Samples supplied within 3 days.
4) 1 year warranty, except for man-made damage.
5) Lifespan is over 10 years.
Ball bearing rack and pinion drawer system is usually used with pallets, it has following features:
1. With crane and hoist in the top, it is convenient to lift the mold;
2. Wheel track is installed below drawer board, so it can be opened easily and reduce labor intensity;
3. Self-locking device ensure drawer fixed when opened;
4. load capacity per layer: 500kg---2000kg;
Feature of Ball bearing rack and pinion drawer system : | |
Surface treatment: | powder coated; |
Packing: | Neutral paper box or in bulk or upon clients requirements; |
Size | As customer's request; |
Container load: | 10-11 ton per 1x20 container, 15-18 ton per 1x40 container |
Payment terms: | TT/ Sight LC |
MOQ: | 1*20ft container |
Delivery terms: | 10 days for 1x20 container, 20 days for 1x40 container |
Quick Instruction for Business of Ball bearing rack and pinion drawer system :
1. | Drawing (if available) |
2. | Size of racking(H*W*L) |
3. | How many bays do you want? |
4. | How many layers do you need? |
5. | Loading capacity of each level? |
6. | (RAL) Color you want. |
Ball bearing rack and pinion drawer system Showcases:
Production Procedure of Ball bearing rack and pinion drawer system :
Packing of Ball bearing rack and pinion drawer system :
Loading of Ball bearing rack and pinion drawer system :
CE & Raw material purchasing sheet of Ball bearing rack and pinion drawer system :
FAQ of Ball bearing rack and pinion drawer system :
1. Q: How can I visit your factory?
A: We are located in Nanjing, Jiangsu Province.
Flying to Nanjing or Shanghai and we will pick you up.
2. Q: What is your advantage?
A:
1) You could get quotation within 24 hours and considerate after-sales service.
2) 15-20 days short production time.
3) Nanjing is a port city, which means lower inland transportation costs.
3. Q: May I know the status of my order?
A: Yes, production information will be updated to you timely.