metal grid shelves,metal folding shelves,oak shelves

metal grid shelves,metal folding shelves,oak shelves

USD $6 - $218 /Set

Min.Order:1 Set

Supply Ability:
40000 Ton / Tons per Month
Port:
Nanjing/shanghai/Other
Payment Terms:
T/T Credit Card PayPal

Quick Details View All >

Place of Origin:
Jiangsu, China
Brand Name:
Whitney
Model Number:
DRWR
Type:
Drive-In Pallet Rack
Material:
Other, Steel, Steel Q235
Feature:
Corrosion Protection

Nanjing Whitney Metal Products Co., Ltd.

Credit Member 4 years
Business Type: Manufacturer,Trading Company
Nanjing Jiangsu China
Main Products: Rack ,pallet rack ,storage rack ,industrial rack ,boltless shelving

Product Details

Specifications

oak shelves:
1).High density storage;
2).Picking goods by pallet;
3).First in last out;
4

 

 

 
Our Services

 

Our Promise as below: ( ^_^ )

 

1. Material is steel Q235, high-quality steel from Jiangsu Shagang Group Co. Ltd., the top 5 steel manufacturer in China;

2. Samples could be supplied for you in 3 days;

3. Products could be customed as your request;

4. Warranty is one year if not artificial reasons!

5. Matters not mentioned herein, could be discussed! O(∩_∩)O

 

 

 

Product Description

Drive in pallet rack requires fewer aisles, allowing you to store up to 75% more pallets in the same space.

 

 Drive In pallet Racking  System for High-Density Storage:

 

Drive-In Rack allow a lift truck to enter the rack from one side to pick up or pull out pallets.

This is done because pallets can slide backwards on a continuous rail.

Forklifts drive into the rack to access pallets two or more deep.

You are limited in the depth of storage for a particular bay by the size of your facility.

Drive-In rack are typically subject to more abuse than selective racks due to the way they are utilized, so rack integrity and strength are important factors. It is ideal rack for cooler or freezer applications.

 

Last-in, first-out arrangement for your pallets

Drive-In rack offer the ability to store a large amount of similar loads in a smaller area. Selectivity is sacrificed, but storage density is outstanding. Drive In Rack can store up to 75% more pallets in the same space than selective racking -- depending on your application. It requires fewer aisles and is better cubic storage.

 

 metal grid shelves,metal folding shelves,oak shelvesDouble Entry Racks - lift trucks can enter from both sides or a row of racks. The center of the rack row is stabilized by a beam.  

metal grid shelves,metal folding shelves,oak shelvesSingle Entry Racks - lift trucks can enter the rack from only one side.

 

 

When should you specify Drive  In Pallet Rack ?

 

1. Drive-In Warehouse Rack is used to store many pallets of a similar product. Lift trucks drive into the rack to extract the first pallet they come to. This is "Last-In, First-Out" storage.

2. Drive-In Rack are widely used in cold storage applications, due to the need to store as many pallets as possible in as little expensive freezer space as possible.

3. When you have seasonal items that move quickly out of your inventory.

4. When you have a large amount of similar items that can be stored in a single pallet position and accessed last-in, first-out

5.If you don't store a wide variety of loads in the rack.

 

Drive in Pallet Rack Load Rail Design:

Load Rails are constructed of durable structural angle steel, providing increased strength and abuse resistance. Standard features include:  

1. Structural angle rails "guide" pallets, ease of use and durability

2. Flared rail entry ends allow easy bay access

3. Space-saver low profile arms increase clearance and decrease possible product damage

4. Welded rail stops prevent loads from being pushed off, improving safety

5.75mm vertical adjustability

6. Welded aisle-load arms to eliminate hazardous load projections into aisles

7. Grade 5 hardware

 

Feature of  oak shelves:

Surface treatment:

power coated;

Packing:

Neutral paper box or in bulk or upon clients requirements;

Size

As customer's request;

Container load:

10-15 ton per 1x20 container, 20-25 ton per 1x40 container

Payment terms:

TT/ Sight LC

MOQ:

1*20ft container

Delivery terms:

10 days for 1x20 container,  20 days for 1x40 container

 

Quick Instruction for Business

1.

Drawing (if available)

2.

Size of your warehouse

3.

Size of racking (H*W*L)

4.

How levels of the racking?

5.

Loading capacity of each level?

6.

(RAL) Color you want.

oak shelves showcases:

 metal grid shelves,metal folding shelves,oak shelves

 

metal grid shelves,metal folding shelves,oak shelvesmetal grid shelves,metal folding shelves,oak shelves

 Production Procedure of oak shelves:

metal grid shelves,metal folding shelves,oak shelves

Accessories of oak shelves:

 metal grid shelves,metal folding shelves,oak shelves

 

 

Packaging & Shipping

Packing of oak shelves:

metal grid shelves,metal folding shelves,oak shelves

 

Loading of oak shelves:

 

 metal grid shelves,metal folding shelves,oak shelves

 

Raw material purchasing sheet&CE certification:

metal grid shelves,metal folding shelves,oak shelves

 

metal grid shelves,metal folding shelves,oak shelves

 
FAQ

1. Q: Are you a factory or trading company? 
 ----
A: We are a manufactory

 2. Q: Where is your factory located? How can I visit there? 

-----A: Our factory is located in Nanjing, Jiangsu Province, China,

1) You can fly to Nanjing Airport directly. We will pick you up on Nanjing Lukou International airport;

2) You can fly to Shanghai Pudong International Airport then come to Nanjing by High-speed railway, then we will pick you up in the railway station.

All our clients, from domestic or abroad, are warmly welcome to visit us! 

3. Q: What makes you different with others?

----A: 1) Our Excellent Service

 For a quick, no hassle quote just send email to us

 We promise to reply with a price within 24 hours - sometimes even within the hour.

 If you need an advice, just call our export office at 0086-15005184524, we will answer    your questions immediately.

2) Our quick manufacturing time

For Normal orders, we will promise to produce within 15 days.
As a manufactory, we can ensure the delivery time according to the formal contract.
4. Q: How about the delivery time?

----A: This depends on the product. Typically standard products are delivered within 10 days. 
The delivery time of the special products is according to the time of setting up of the tooling.

5. Q: What is the term of payment? 
----A: 1) T/T payment.     2) LC

6. Q: May I know the status of my order?

----A: Yes .We will send you information and photos at different production stage of your order. You will get the latest information in time.

7. Q: Are samples available?

----A:  Yes, we can send some sections of samples for your reference by express.

Contact Supplier

Ms. Emily Cow Sales Manager Chat Now
Telephone
86-25-83731980
Mobile
0086-13813896304
Address
No.8,Jinhua Road,Guli Industrial Zone,Nanjing,China Nanjing,Jiangsu

You May Like

New Products

Find Similar Products By Category

Service Equipment > Store & Supermarket Supplies > Stacking Racks & Shelves
Categories
Hi~