High quality Different types of China cuplock scaffold
USD $300 - $800 /Metric Ton
Min.Order:20 Metric Tons
Tianjin Gaoboli Trading Co., Ltd.
Product name | High quality Different types of China cuplock scaffold |
Pipe Diameter | 42mm, 48.3mm, 60.3mm |
Wall Thickness | 1.5mm -4.0mm |
Material | Q235, Q345 |
Surface | Hot galvanized , painted, Powder Painted |
Components | Standard, Ledger, Strengthened ledger, Transom Beam, Diagonal, Bracket,Top cup, Bottom cup, Ledger blade, etc. |
Zinc coating | 200g/m2 + |
Advantage | Durable, Stable, Skid-proof, Antirust, Easy to assemble & Dismantle |
Scaffolding types | Ringlock systerm, Frame ssysterm, Banana Scaffold, Cuplock systerm, etc. |
Tianjin Gaoboli Trading Co., Ltd is focus on different kinds of Scaffolding systerms, such as Ringlock
systerm, Frame ssysterm, Banana Scaffold, Steel props, Steel plank, Tripod, scaffolding parts and
steel pipes. Our company have been maintaining close cooperation with many large national steel
factories. We sincerely wish to develop long-term win-win cooperation with clients from all over the world.
1. 24 hours online service for you.
2. Free sample can be provided.
3. Small order is acceptable.
4. OEM is acceptable.
5. Any third party testing is acceptable.
6. Promise To delivery the goods on time.
7. We have supported Trade Assurance which is a free service provided by
designed to covers buyers on with 100% payment protection.
Rest assured that you can trade with us with confidence.
Contact Information:
1. Can you send me your whole price list?
Sorry, as the price relates to many factors, such as quality & quantity, after we confirm
your detail request, we will offer you exact quotation.
2. What is the M.O.Q?
The MOQ Usually is 10 metric ton.
3. Do you charge for the samples?
According to our company principle, we just charge for samples, you pay for the freight
charge However, we will return the samples fees back to you during the next order.
4. How about the Delivery Time?
According To The Quantity And Specification Of Each Order, Usually within 10- 30 days
after receipt of deposit, ASAP