2UB10 cement/slurry/mortar pump Supplier's Choice
USD $1,500 - $2,000 /Set
Min.Order:2 Sets
Liuzhou HM Prestressing Machinery Co., Ltd.
Usage:
:1. 2UB10 cement/slurry/mortar pump isfor horizontal and vertical conveying ash in construction project
2. used for maintaining blast furnaces and other equipment in metallurgical iron and steel sector
3. for grouting in tunnel construction,national defence engineering,other defense engineering and mining
4. for transfering printing ink, coating, magnetic material or other media
5. used to reinforce the dam In farmland, water conservancy project
6.for reinforce the wall in sand drilling
7.for grouting and reiforcement of bridge,culvert in the railway construction
8. for conveying fly ash slurry in steam power plant
Structure:
1.transmission mechanism
2.pump body
Figure1:Structrural Diagram of Motar Pump
1.oil-down chamber 2.diaphragm 3.plunger 4.piston rod 5.cross head 6.the connecting rod
7.crankshaft 8.the big belt wheel 9.triangle belt 10.small belt wheel 11.electric motor ucing gear
13.garand 14.asbestos rope 15.elbow pipe 16.suction valve 17.cylinder pump 18.discharge valve
19.air chamber 20.oil-up chamber
1. air chamber
2. oil-down chamber
3. diaphragm
4.oil-up chamber
5. Magnet type electric contact pressure gauge
6.pinout and joint distribution box
Technical Performance Parameters:
mortar conveying capacity | m3/h | 3 |
working pressure | MPa | 2 |
motor power | KW | 4 |
motor speed | r/min | 1440 |
plunger cylinder number | 1 | |
diameter of outer sluury plastic pipe | mm | 38(1.5") |
diameter of inner sluury plastic pipe | mm | 64(2.5") |
weight | Kg | 250 |
outer size(length*width*height) | mm | 1100*470*940 |
our features:
We provide after-sale service, technical support, personalization and processing, production on-demand and strictly in accordance with the buyer requirements to provide quality services. Provide engineering construction for bridge,railway,building etc,and maintenance and reinforcement of bridge.We have a strong engineering team who are all qualified and resolve kinds of problems during construction.