5mm APP roofing asphalt watrproof membrane
USD $2.5 - $5 /Square Meter
Min.Order:1000 Square Meters
Wuhan Star Waterproofing Co., Ltd.
1. Product Description
APP modified bitumen membrane is a kind of flexible sheet waterproof material, which uses amorphous polypropylene (APP) modified asphalt as a dipping and covering modifier, whose upper surface is coated by PE film, fine sand, mineralgrain or aluminum foil or other isolating materials.
2.Characteristic
3. Applications
4.Pictures for your reference
Our factory
Certificaiton Show
5. Technical Index(Executive standard: GB18242-2008)
Serial number | Index | Index | ||||||||||||||||||
I | II | |||||||||||||||||||
PY | G | PY | G | PYG | ||||||||||||||||
1 | Heat resistance | °C | 110 | 130 | ||||||||||||||||
≤ mm | 2 | |||||||||||||||||||
Test phenomenon | No sliding, flowing, dripping | |||||||||||||||||||
2 | Low temperature flexibility:°C | —7 | —15 | |||||||||||||||||
No cracks | ||||||||||||||||||||
3 | Not permeable 30min | 0.3MPa | 0.2MPa | 0.3MPa | ||||||||||||||||
4 | Pull | Maximum peak of La: N/50mm≥ | 500 | 350 | 800 | 500 | 900 | |||||||||||||
Peak pull: N/50mm≥ | — | — | — | — | 800 | |||||||||||||||
Test phenomenon | Stretching process, the central specimen without cracking or seal coating of asphalt-based separation of fetal | |||||||||||||||||||
5 | Elongation | When the maximum peak elongation:%≥ | 30 | — | 40 | — | — | |||||||||||||
When the second peak elongation::%≥ | — | — | — | 15 | ||||||||||||||||
6 | Thermal aging | Rally retention:%≥ | 90 | |||||||||||||||||
Elongation retention:%≥ | 80 | |||||||||||||||||||
Low temperature flexibility:°C | -2 | -10 | ||||||||||||||||||
No cracks | ||||||||||||||||||||
Size change rate:%≤ | 0.7 | - | 0.7 | - | 0.3 | |||||||||||||||
Mass loss:%≤ | 1.0 | |||||||||||||||||||
7 | Artificially climate accelerated aging | Exterior | No sliding, flowing, dripping | |||||||||||||||||
Rally retention:%≥ | 80 | |||||||||||||||||||
Low temperature flexibility:°C | -2 | -10 | ||||||||||||||||||
No cracks |
6.Storage and transportation
1) Different type and specification should be stacked separately;
2) Avoid sun-scorched and rain-drenched, Be ventilation;
3) The storage temperature should below 50°C;
4) It have to be one storey when keep in storage stand on end, and shouldn't be more than two storeys when transporting;
5) Avoid tilting or lateral drift, Covered with tarpaulin if need;
6) Base on the normal storage and transportation, the storage period is one year from the date of production.
7. construction technology
1) Base processing: the base surface must be clean, solid, level, dry; no grit, rift and loosing dust. For a large recess, fill it with cement mortar and then level it. Remove the protrusion and clean dust. If working on base slab or lateral face, water lowering should be done.
2) Painting primer: before laying the membrane, clean the dust on the surface of concrete base with dust catcher or dust-blower.
3) Heat to melt: place membrane correctly, fire torch, heat the membrane with base entirely, when the surface of the membrane is black and bright with a fusion layer, apply the membrane and press it into a solid and flat state. Before the membrane is cool, seal the edge of joint by float.
4) Requirements for lapping: There should be less than 3 layers of lapping, with the joint seams appearing as "T" type, avoid 4 layers of lapping. The width of longitudinal lapping is between 50 and 80mm, and of end-lap joint 100mm.
Sample is free of charge.
Reasonable Price, Excellent Quality & Attentive Service.
The delivery time is about 15-20 days after receiving the deposit.
We offer not just excellent products but service and market solutions.
Welcome to visit our homepage or contact with us for more information.
Thank you.