JS Polymer Waterproof Coating
JS Polymer Waterproof Coating
JS Polymer Waterproof Coating
JS Polymer Waterproof Coating
JS Polymer Waterproof Coating
JS Polymer Waterproof Coating

JS Polymer Waterproof Coating

USD $2 - $2.3 /Square Meter

Min.Order:100 Square Meters

Supply Ability:
1000000000 Kilogram / Kilograms per Month
Port:
wuhan
Payment Terms:
T/T L/C D/P D/A Credit Card PayPal

Quick Details View All >

Place of Origin:
Hubei, China
Brand Name:
Star

Wuhan Star Waterproofing Co., Ltd.

Business license
Business Type: Manufacturer
Wuhan Hubei China
Main Products: SBS Modified Bitumen Waterproofing Membranes ,Self Adhesive Bitumen Membranes ,PVC Waterproofing Membranes ,Polyurethane Waterproofing Coatings ,APP Modified Bitumen Waterproofing Membranes

Product Details

Main performance

 

1.Environmentally friendly products, non-toxic, non-polluting, safe to use.

2.Products can be in a dry or wet material base construction.

3.High strength, high elasticity coating, water resistance excellent weathering resistance, with a variety of primary bonding firm.

4. On the facade, plane, inclined plane can direct construction, no running, simple operation, can be   directly added pigment formation of color coating.

 

 

Scope of application

 

The product can be used in wet or dry masonry, mortar, concrete, metal, wood, plastic, glass, plaster board, foam board, asphalt, rubber, SBS membrane, such as polyurethane based on construction, industrial and civil architectural ( example: room floor, wall, underground, tunnel, bridge, pond, reservoir kitchen, toilet ).

 

 

Item No.

JS

Product characteristics

 

1. non-toxic, non-pollution, environmental-friendly

2.resistant to elevated temperature,water

3.good climate resistance,excellent cohesiveness

ating of tough

Application scope

 

1.roof, basement, exterior wall, lavatory,foam boam,asphalt

2.building parts such as crack, wall tubes, water drain places.

3.underground,tunnel,bridge,pond,reservoir,kitchen

Package

— Plastic barrels and woven bag with liner inside sealed packaging;

— 20kg/pail

     Proportion

  liquid material : powder material  8:12

Storage

Be storage in cool dry place, liquid material against sunshine and frozen, while powder material  prevent affected with damp.

Shelf Life

12 months

Construction condition

—Construction temperature should be above 0°C

—Open-air project avoid rainy days or avoid construct on base surface with water.

—Do not do second coating until the first coating is dry

—The construction of protective layer or decorative layer should be done only after the first coating is dry.

Coat Recommended

3 coats

Application method

Brush

MOQ

25 barrels

Lead time

3-5days

Port

Huangpu(Guangzhou)

Payment

30% advance, 70% balance should be paid once production finished;T/T for the current stock

 

Construction technology

 

1.Clean the surface, surface requires a firm and flat, with strength, not hollowing loose, sand and other phenomena, the yin-yang angle should be put into a circular, with a water outlet phenomenon should do first leakage treatment.

 

2.Use the blender stir and slowly add the powder, stirring for 5 minutes, stirring until the feed does not contain aggregate, with good material should be used up within 2 hours, otherwise will influence the construction of elevated viscosity. (Powder material can be directly used to replace ordinary Portland cement)

 

Coating weight ratio method according to the product packaging dimension scale ingredients, water adding amount can be adjusted properly, to adjust the coating station consistency, to meet the different parts of the construction elevation and plane.

 

Embedded in the groove sealing material, in the corner, pipe root and other details shall many times (2-5 times of brushing), underground engineering to paving a layer of reinforcement material

 

Each layer of brushing time interval of 8 hours, the winter should be extended, each over the film in0.4-0.5mm as well, should not be over too thick, inside construction should not add water or less water as well, in order to avoid coating flows.

 

3.Apply construction, primary processing, primer, additional layer construction, surface coating and protection layer

 

4.Using a brush or roller brush paint brush evenly on the grass-roots , should be painted horizontal and vertical cross, interval of 4 hours or more. General primer two, surface coating two, additional layer using 45-60grams / square meters of non-woven fabrics, each square was 3kg, thickness of 1.5mm, if have special structural requirements may account for the increased surface besmear brushes number.

 

Matters needing attention

 

1.Ingredients to accurate metering, mixing evenly, use should not add water.

 

2.Construction of the temperature should be above 0 degree, under negative temperature construction shall take the necessary freezing measures.

 

3,Waterproof coating is now with the current use, and used it within four hours.

 

Transportation and storage

1.Should be in 0 degree above the dry, cool storage place, storage period of 6 months.

2.Each packing 20kg / barrel.

Contact Supplier

Mr. Star sales manager Chat Now
Telephone
86-27-84777225
Mobile
86-18672778652
Address
huangjinkou industrial area, hanyang, wuhan china Wuhan,Hubei

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Construction & Real Estate > Waterproofing Materials > Other Waterproofing Materials
Categories
Hi~