2016 hot sell high quality exercise bike for home use
SPECIFICATION
Monitor:Time ,Speed, Distance ,Calories and pulse
5Kg inner magnetic wheel, 3pcs crank
8-level manual resistance
ribbed belt two ways
En class:ISO 20957;EN957-5/Class HC
PACKING DETAILS
Carton Size: 85x28x63CM
Assembly Size: 95X 57 X 130CM
Loading quantity 20': 180pcs
Loading quantity 40': 380pcs
Loading quantity 40'HQ: 445pcs
G.W.: 30KGS N.W.: 27KGS
Item photos:
Computers, can be with MP3 function:
covers detail:
We've passed WAR- MART factory audit, WAR- MART ID: 36131944
Payment & Delivery
- 30% deposit, balance 70% against B/L copy or L/C at sight
- Delivery Date: Normally 35-45days after receipt of 30% deposit, depend on the QTY of the order.
Considerate Service We Provide - We Take Care Of Your Order
Punctual delivery time:
- We put your order into our tight production schedule, ensure your punctual delivery time.
- We provide Inspection or production report before your order packed.
- We sent shipping notice or insurance to you as soon as your order is shipped.
After sales service:
- We respect your feed back after receive the goods.
- We provide 12 to 24 months warranty after goods arrive.
- We promise all spare parts available in lifetime use.
- We handle your complaint within 48hours.
Professional sales:
- We value every inquiry sent to us, ensure quick competitive offer.
- We are a sales team, with all techinical support from engineer team.
Outstanding Quality We Provide - Strict Quality Control
Control from production process:
- We don’t send parts out for pretreatment, all process would be supervised under inspection department
- 7 stages pretreatment meet international standard
- Baking at high temperature after power coating to ensure the paint finish
Control from material:
- All the material are inspected before entering to warehouse
- All bolts and screws are of SS material
- Mild steel ERW rectangular tubes or sheets 1.2-2.0mm thickness, meet EU standard
- Plastic material Durable and Sturdy. Over 5 years lifetime. Different colors for options
Control from inspection:
- Process inspections after cold working, acid washing, powder coating and assembling
- Final inspection before loading in random checking
- All the treadmill are tested one by one in quiet room
- SGS or other third party inspection available if required