E POLYLOCK concrete embedment strip
USD $0.1 - $1 /Piece
Min.Order:1 Piece
E POLYLOCK concrete embedment strip
HDPE lock for Geomembranes
Geolock PolyLock HDPE Lock HDPE E-lock Concrete embedment strip for HDPE Geomembranes,
E-shaped made from HDPE with three anchors, the anchors will be embeded in new cast-in-place or precast concrete construction, then provide a surface for geomembrane liner to help the installing.
1:Product specifications:
Production Standard:ASTM
Color:black
Density:0.94g/cm3
Thickness:4.76mm
Width:101.60mm
Hight: 28.70mm
Length:Normal 3m, or customized.
2: Feature:
(1) geomembrane connection lock is a flexible waterproof material, with high seepage coefficient.
(2) having good heat resistance and cold resistance, the temperature of the environment of high temperature 110 C, low temperature -70C.
(3) has good chemical stability, resistant to acid, alkali, oil, corrosion is good anti-corrosion materials.
(4) has a very high tensile strength, it has a high tensile strength to meet the high standards of project needs.
(5) has a strong weather resistance, has a strong anti-aging properties, and prolonged use can maintain the original performance. (6) has a strong tensile strength and elongation at break, so HDPE geomembrane can be used in a variety of harsh geological and climatic conditions. Strong adaptability to adapt to uneven settlement.
(7) excellent UV stability.
3: Application:
(1) Environmental protection, sanitation, such as living garbage burying field, adjusting pool, industrial sewage treatment plant, power plant, hospital solid waste treatment plant slope.
(2) Water conservancy project (the seepage control and reinforcement of the reservoir dam, the vertical wall, prevent slope).
(3) Municipal engineering (subway, the structure of the underground engineering, sewage pipe lining),Garden (artificial lake, river, reservoir, ponds slope protection of golf course).
(4) Petrochemical, chemical plants, refineries, gas oil tanks of seepage control, chemical reaction pool, sedimentation tank lining. (5) Mining (washing pool, pool heap leaching, heap yard, dissolving tank, tank, tailings seepage control of slope).
(6)Transportation (highway foundation reinforcement and seepage control of metro, culverts).
4: Installation Instructions:
E-lock installed in a position reserved for a period of recess when pouring concrete, to be impervious construction of the E lock embedded in the groove, and pouring concrete forming again, lock that is fixed on the surfaces of buildings,Laying of HDPE geomembrane extrusion welding and E-lock connection.