1MW gas generator parallel to 4MW power plant
USD $250,000 - $1,000,000 /Set
Min.Order:1 Set
CE approved gas generator water cooled nature gas generator 20-1000kw
irrigation,drainage,dredge,fire fighting,mining,construction water pump diesel engine driven
irrigation,drainage,dredge,fire fighting,mining,construction diesel water pump
irrigation,drainage,dredge,fire fighting,mining,construction diesel engine water pump
irrigation,drainage,dredge,fire fighting,mining,construction diesel engine water pump set
1 MW gas generator
Parameter of 1MW natural gas generator set | |
model | UP-1000GFT |
power(kw/kva) | 1000/1250 |
rated speed(rpm) | 1500 |
power factor | 0.8 |
rated frequency(HZ) | 50 |
rated voltage(V) | 400/415 |
Dimension(mm) | 8000*2360*2400 |
net weight(kg) | 14000 |
Parameter of gas engine | |
gas engine model | UP6126NG-AZLD |
Power(kw) | 4*275 |
type | Inline, four-stroke, water-cooled |
rated speed(rpm) | 1500 |
Displacement (L) | 11.596 |
gas consumption(m3/h) | 260 |
cylinder No. | 6 |
bore*stroke | 126*155 |
Parameter of alternator | |
Model | 4*MP-250-4 |
power(kw/kva): | 1000/1250 |
Speed(rpm) | 1500 |
phase/wires | 3 phase/4 wires |
1.Anti corrosion structure: all steed soundproof box,lining with fire-resistant and silencing material,to ensure the unit work in any enviroment.
2.Damping device:between the engine,generator and generator set chassis equipment with a plurality of damper to ensure stable operation of the genset and increase the genset life.
3.Standardized:the design,production and testiong of genset,fully meet the national standard GBT2820-97 and European CE safety standards.
4.Fuel tank:provide in base plate,meet the unit full load running 8 hours.
5.Transportation:through a hoisting ring groove bottom and top of the forklift,and covenient transportation.
6.Connection:through terminals(A,B,C,N) make the connection more simple and arranging more orderly.
♦ Gas Utilization
Natural gas and Wellhead associated gas
Coalbed methane,biogas,landfill gas
Coke oven gas,blast furnace gas,refineryoff-gas
♦Gasbasic requirements
No liquid water and oil
≤100mg/m3 Hydrogen sulfidecontent of 100mg/m3
5KPa Gas pressureof not less than 5kpa
♦Power Systemprogram
Gas power plant systems including gas-fired units and ancillary facilities,inaddition to the basic unit facilities include:
Separation ofgas supplyandharmful impurities(such as dehudration,desulfurization,catchingcoke) system
♦Outer Loopcooling system(open cooling unit)
Power station sites,computer room,crew base
♦Waste heatrecovery system(based onpower plant features optional)
High and low voltagecontrol room; transmission line
Run with consumables ware house,duty officer basic amenities
Standard Configuration of Gas Generator:1000kw gas generator
1. New gas engine
2. Radiator 40°C max,fans are driven by belt,with safety guard
3. 24V charge alternator
4. New Alternator(Stamford or Marathon),single bearing, IP22-23, insulation class H,brushless
5. Steel frame base, shock absorber
6. Gas pressure regulator(MADAS,Italy),air and gas mixer(IMPCO,USA)
7. Electronic speed governor and actuator
8. Back-fire relief valve
9. Dry type air filter, oil filter
10.Main line circuit breaker
11.Digital automatic control panel
12.Emergency stop button
13.Two 12V batteries,rack and cable
14.Ripple flex exhaust pipe,exhaust siphon, flange, muffler
15.Spare parts and tools, User manual etc.
Optional Equipment: 1000kw NG LPG Biogas gas generator
1.Oil/coolant heater
2.ATS(Automatic Transfer Switch)
3.Soundproof canopy
4.Parallel system
5.Grid-connect system
6.CHP/Cogeneration
If you want 2MW or more larger power,we can make professional solutions for you.
Welcome here,we'll go all out to satisfy you well with competitive price.