Factory Price metal layer scaffolding standard bs1139 steel tubular scaffolding for construction
USD $5 - $15 /Piece
Min.Order:25 Pieces
Tianjin Heshunchang Scaffolding Co., Ltd.
Factory Price metal layer scaffolding standard bs1139 steel tubular scaffolding for construction
Product name | ADTO Scaffolding zinc-coating steel pipe |
Description | High tensile scaffolding pipes are designed for pipes & coupler scaffolding.The pipes have hot dippe dgalvanized surfaces finish so as to provide excellent appearance with sufficient durability in such applications where salty air or long term weather exposures are inevitable. |
Standard | BS1139:1775 , EN39:2001 ,JIS G3444:2004 |
Steel Grade | BS1139 :1775:Q235B , Q345B EN39:2001: S235JR , S355JR, JIS G3444:2004: STK400 / STK500 |
Packing | Hexagonal bundles of max. 3,000kg with several steel strips, Two tags on each bundle, Wrapped in waterproof paper |
Test: | Chemical Component Analysis, Mechanical Properties (Ultimate tensile strength, Yield strength, Elongation), Technical Properties (Flattening Test, Bending Test, Blow Test, Impact Test), Exterior Size Inspection, Hydrostatic Test, X-ray Test. |
Third party inspection: | SGS, BV, Lloyds etc. |
Standard Size:
galvanized scaffolding tube Outside diameter (mm) | galvanized scaffolding tube Wall thickness (mm) | galvanized scaffolding tube Length (m) |
48.3-48.6 | 2.0-2.5 | 0.3-12 |
48.3-48.6 | 2.75 | 0.3-12 |
48.3-48.6 | 3.0 | 0.3-12 |
48.3-48.6 | 3.2 | 0.3-12 |
48.3-48.6 | 3.6 | 0.3-12 |
48.3-48.6 | 3.8 | 0.3-12 |
48.3-48.6 | 4.0 | 0.3-12 |
38.1 | 4.0 | 0.3-12 |
42.3 | 4.0 | 0.3-12 |