5052 H26 aluminum alloy sheet good surface quality
Negotiable /Ton
Min.Order:5 Tons
Suzhou Southeast Aluminum Sheet Co., Ltd.
Provide shearing and leveling aluminum sheets or aluminum coils, we can customize as your requirement !
Quik details:
Grade :5000 Grade
Alloy or not: Alloy
Temper:O-H112
Thickness:0.3-3.0mm
Width:30-2000mm
Origin:Jiangsu Province ,China
Brand name: Suzhou Southeast
5052 has excellent corrosion resistance especially to seawater and industrially polluted atmosphere.
Chemical Composition | ||||||||||||
Item | Si | Fe | Cu | Mn | Mg | Cr | Ni | Zn | Ti | Zr | Al | Remainder |
Min | / | / | / | / | 0.5 | / | / | / | / | / | / | 0.05 |
Max | 0.3 | 0.7 | 0.2 | 0.2 | 1.1 | 0.1 | / | 0.25 | / | / | Remain | 0.15 |
Company information
Founded in 2004, Suzhou Southeast Aluminum Sheet Co., LTD. is a manufacturer of aluminum material located in Suzhou, Jiangsu Province.
Our company is mainly engaged in processing and sales of aluminum, we have one 2050mm and one 1250mm kaiping machine, one 1250mm slitting shear line, one 650mm slitting shear line, one 2100mm, one 1450mm and one 650mm tenso-shear line, five 1300mm and one 1250mm shearing lines, and two set of film laminating. Because of the above machine our production ability will be about 7000 tons every month.
Our main products include 1xxx series, 3xxx series, 5xxx series, 6xxx series and 8 xxx series aluminum sheets, aluminum plates, aluminum coils, aluminum strips, aluminum foil and so on, thickness vary from 0.1mm to 20mm. Our main market is Canada, Austrailia, Ukraine, Russia, Janpan, Cuba, Bosnia, Thailand, Vietnam, Korea, Egypt and worldwide.
As a reliable supplier, we have pass the below certification. payment accept TT or L/C at sight
FAQ:
1. Can you provide free samples ?
Yes, we'll provide free sample in 2-3 days
2. Can you customize as our demand size ?
Yes, We can cutting and level according to your size
3.Do you have quality certificate ?
Yes, our quality meet GB/T 3880 standard ,we will provide mill test certificate by ourself
4. What's your general lead time ?
We have a lot of stock material ,normally need 3 days to process and packing ,it will take 5 days to ship it to Shanghai port