Injection plastic freezer parts mould,plastic transparent refrigerator drawer mould
USD $3,000 - $10,000 /Set
Min.Order:1 Set
Taizhou City Huangyan Kaizhen Mould Co., Ltd.
Injection plastic home appliance mould plastic parts mould for refrigerator mould
Plastic refrigerator mould,plastic transparent refrigerator drawer mould
Injection plastic DVD case mould DVD shell mould plastic DVD box mould
Injection plastic single-container washing machine mould/Plastic household appliance mould
Injection plastic air blower mold,plastic blower mold in Huangyan
Name | Description |
Mould material | P20, 718, 2738, S136, 2316, Nak80 etc. |
Mould base | LKM, HASCO, DME |
Mould cavity | Single/multi |
Mould runner | hot/cold |
Plastic material | PP, PC, PS, PE, PU, PVC,TPE, ABS etc. |
Design software | UG, PROE, CAD, CATIA, SolidWorks |
Mould life | 2,000,000 shots |
Delivery time | 25-45days |
Specifications | Depends on customer’s requirements |
Mould picture:
Packaging details:
Kaizhen Mould Trade Step:
1.Sample/Drawing | We need your detail require clearly. | ||
↓ | |||
2.Negotiation | Material,cavity,price,delivery time,payment term ,etc. | ||
↓ | |||
3.Place order | According your own design or choice our design. | ||
↓ | |||
4.Mould design | We will communicate&Exchange the opinion with you during making drawing | ||
↓ | |||
5.Tooling mould | After customer approve the mould design will start making mould. | ||
↓ | |||
6.Mould process | Provide updated tooling schedule every week to show the process | ||
↓ | |||
7.Sample confirm | Send you sample for conform it ,if not satisfied by customer.we modify mould . | ||
↓ | |||
8.Delivery mould | Delivery mould after customer approve sample and arrange shipment. |
Ensures you to use:
Good steel with high hardness
Good accessories with high brightness
Good machining with high precise.
Offers you:
In-time response on letters, telephone calls or fax
In-time supply the quotation and mould designs
In-time communication on the technical points
In-time sending pictures for the mould machining progress and mould finishing schedule
In-time mould test and sample delivery
In-time mould delivery