Al Jazirah stainless steel wire
USD $888 - $888 /Roll
Min.Order:1 Roll
Henan Joinrise Mining Equipment Manufacture Co., Ltd.
Wirerope with variety model provided by
honest supplier
Henan Joinrise Mining Equipment Manufacture Co., Ltd.
Scope of application:
This wirerope is widely applicable in electrical wiring, mining, high-lift hoisting machinery, ship bulding, port etc.
Wirerope description
This type is designed for specail engineering needs, and made of fine hot galvanized steel wire through specail production process. The wirerope is inter-braided with multiple strands into a rope with square or hexagonal and face.
As the center of the end face counteracts the resultant monent. The rope maintains torsion-proof when affected by force, and it greatly reduces corrosion and rust.
Parameters of steel wirerope
Type | Nominal Diameter (mm) | Structure | Weight (Kg/m) | Wirerope Breaking Force(T) | Standard Length (m) | ||
Strand Structure | |||||||
1x19 | 1x19w | 1T25 1T29 | |||||
YS6-8x19 | 6 | Square8-Strand | 0.115 | 16 | 17.5 | 1000 | |
YS7-8x19 | 7 | Square8-Strand | 0.185 | 32 | 36 | 1000 | |
YS8-8x19 | 8 | Square8-Strand | 0.220 | 38 | 40 | 1000 | |
YS9-12x19 | 9 | Square12-Strand | 0.280 | 50 | 55 | 1000 | |
YS11-12x19 | 11 | Square12-Strand | 0.480 | 70 | 80 | 1000 | |
YS13-12x19 | 13 | Square12-Strand | 0.630 | 105 | 120 | 1000 | |
YS16-12x19 | 16 | Square12-Strand | 0.925 | 140 | 158 | 1000 | |
YS18-12x19 | 18 | Square12-Strand | 1.150 | 185 | 540 | 1000 | |
YS20-12x19 | 20 | Square12-Strand | 1.320 | 250 | 1000 | ||
YS22-12x1T25 | 22 | Square12-Strand | 1.882 | 320 | 1000 | ||
YS24-12x1T25 | 24 | Square12-Strand | 2.034 | 360 | 1000 | ||
YS26-12x1T25 | 26 | Square12-Strand | 2.350 | 420 | 1000 | ||
YS28-12x1T29 | 28 | Square12-Strand | 3.012 | 480 | 1000 | ||
YS30-12x1T29 | 30 | Square12-Strand | 3.320 | 540 | 1000 | ||
YL9-12x19 | 9 | Hexagon12-Strand | 0.297 | 50 | 1000 | ||
YL11-12x19 | 11 | Hexagon12-Strand | 0.480 | 70 | 1000 | ||
YL13-12x19 | 13 | Hexagon12-Strand | 0.630 | 105 | 1000 | ||
YL16-12x19 | 16 | Hexagon12-Strand | 0.925 | 140 | 1000 | ||
YL18-12x19 | 18 | Hexagon12-Strand | 1.150 | 185 | 1000 | ||
YL20-12x19 | 20 | Hexagon12-Strand | 1.320 | 250 | 1000 | ||
YL22-12xT25 | 22 | Hexagon12-Strand | 1.822 | 320 | 1000 | ||
YL24-12xT25 | 24 | Hexagon12-Strand | 2.034 | 360 | 1000 | ||
YL26-12xT25 | 26 | Hexagon12-Strand | 2.350 | 420 | 1000 | ||
YL28-12xT29 | 28 | Hexagon12-Strand | 2.882 | 480 | 1000 | ||
YL30-12xT29 | 30 | Hexagon12-Strand | 3.120 | 540 | 1000 | ||
YL13-18x19 | 13 | Hexagon18-Strand | 0.645 | 105 | 120 | 1000 | |
YL16-18x19 | 16 | Hexagon18-Strand | 0.925 | 140 | 158 | 1000 | |
YL18-18x19 | 18 | Hexagon18-Strand | 1.198 | 185 | 210 | 1000 | |
YL20-18x19 | 20 | Hexagon18-Strand | 1.598 | 280 | 300 | 1000 | |
YL22-18xT25 | 22 | Hexagon18-Strand | 1.898 | 389 | 1000 | ||
Breaking Force:It's a tensile force value when the wirerope is broken. Based on the experiments analysis, the conclusion is that has obvious linear correlation between the breaking force of the steel wire rope and the diameter of the steel wire; the breaking force of rope has obvious linear correlation with the diameter, number of bends, tensile strengty.
1. What is the advantage of Joinrise compared to other suppliers?
Since the manufacturing team all possesses years of experience, Joinrise can provide conveyors and accessories with competitive price and superior service. We have professional sales team, production team, researching team.
2. What is the price policy of your company?
In our company, the price is different according to the quantity of your order, the more the cheaper. For more detailed information, you can contact our customer service representatives.
3. What are the features of the services your company offered?
Based on the wide product range, we offer the best One-Stop sourcing service and all-around after-sales service . We will definitely save you a lot of time and money. It will improve your efficiency significantly and be more economical.
4. What is the payment of your company?
Joinrise accepts the payment of T/T and L/C, 30%T/T in advance, 40% after shipment, the balance D/P,everything can be further discussed.