Good quality mining belt conveyor impact idler roller
USD $10 - $50 /Piece
Min.Order:100 Pieces
Henan Joinrise Mining Equipment Manufacture Co., Ltd.
Good quality mining belt conveyor impact idler roller
1.Impact roller description:
Impact roller is made of cushioning material, which can help prolong the life span of conveyor belt by reducing the huge impact force produced by the loading of material.Impact roller in common use consists of rubber gasket, roller tube core, axis, bearing,bearing pedestal and seal ring.
2.Roller conveyor idlers basic parameters and dimensions and bandwidth combination table:
Main parts of conveyor roller:
1.Pipe
2.Shaft
3.Bearing
4.Seal
2.The welding of the conveyor roller
3.The test of the conveyor roller
Henan Joinrise Mining Equipments Manufacture Co.,Ltd was established in 2004, with a total investment of 10,000,000 yuan. Our company specialized in manufacturering, R&D, designing and selling electromechanical equipment, mainly including conveyor belt, conveyor roller and other conveying equipment spare parts . Our company is well-equipped testing facilities and strong technical force.
Adhering to the business philosophy of "Convey Power,Convey Value", and with standardized management, excellent quality and thoughtful service, our company hopes to work hand in hand with clients to achieve long-term win-win cooperation.
1.What products does your company mainly produce?
We mainly provide Conveyors and Belt conveyor parts:
Conveyor rollers
Conveyor belts
Conveyor pulleys/drums
2.Uncompromising strength
Advanced research achievments,outstanding technical design.
Precision manufacturing technology with patented technology.
Efficient operation and long life, reduce maintenace costs.
Patented technology gives it superior wear resistance and corrosion resistance.
Through long-term use, it proves that the working life is beyond 6 times as much as normal conveyor pulley under the same envioronment.
We established a new standard in this field.
3.What is the lead time?
In general, mass production needs 15-30 days, also according to the order volume.